Bishwendu Paul
- Listed as
- architect, engineer
- Firm
- Earthquake & Structural
- Based in
- Oakland
- On San Francisco permits
- Apr 2004 to May 2025
20 permits since 2000 (engineer on 19 permits, architect on 1 permit): 13 completed, 1 in progress, 4 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 16, 2025 | Completed final sign-off Aug 2025 | 37 Miguel St | K C Kitchen And Bath Builder | unit 6: revision to permit 202505136343. reconstruction of rotted/damaged stairs with waterproofing membrane. no change in configuration. work to be done on back side of both properties.Details
unit 6: revision to permit 202505136343. reconstruction of rotted/damaged stairs with waterproofing membrane. no change in configuration. work to be done on back side of both properties. | $10,000 |
| Apr 14, 2025 | Completed final sign-off Aug 2025 | 39 Miguel St | K C Kitchen And Bath Builder | revision to pa# 202503051619: reconstruction of rotted portions of existing stair with waterproofing membrane, no change in configuration.Details
revision to pa# 202503051619: reconstruction of rotted portions of existing stair with waterproofing membrane, no change in configuration. | $10,000 |
| Jun 26, 2024 | In progress issued Jun 2024 | 3697 25th St | M N Construction | revision to pa 202104128307 field condition steel beam to column connections update. ref pa 202305268720Details
revision to pa 202104128307 field condition steel beam to column connections update. ref pa 202305268720 | |
| May 26, 2023 | Never finaled issued Jul 2023, no final | 3697 25th St | M N Construction, Modern Craft Construction | revision to pa 2021-0412-8307 (n) wood stairs < 30 above (e) grade; (n) retaining wall below (e) grade; (n) window wells below grade; (e) stairs to basement to be removed excavate part of rear yard 22"Details
revision to pa 2021-0412-8307 (n) wood stairs < 30 above (e) grade; (n) retaining wall below (e) grade; (n) window wells below grade; (e) stairs to basement to be removed excavate part of rear yard 22" | $10,000 |
| Jul 12, 2022 | Completed final sign-off Sep 2024 | 1100 Prague St | La Joya Construction Inc | to comply with nov# 202055379. (n) adu at ground level.Details
to comply with nov# 202055379. (n) adu at ground level. | $31,500 |
| Apr 12, 2021 | Never finaled issued Nov 2022, no final | 3697 25th St | Klaus Kubler Construction, M N Construction, Modern Craft Construction | adu basement alterations. 1st floor prep kitchen. 2nd floor bedrooms & bath. remodel finish.Details
adu basement alterations. 1st floor prep kitchen. 2nd floor bedrooms & bath. remodel finish. | $115,000 |
| Feb 25, 2021 | Completed final sign-off Apr 2021 | 5305 California St | Francis Mullan Construction | revision to pa#202010176768. revise size of stair/stair landing footing size from 18" sq to 14" sq (per calculations).Details
revision to pa#202010176768. revise size of stair/stair landing footing size from 18" sq to 14" sq (per calculations). | |
| Jan 28, 2021 | Never finaled filed Jan 2021, never issued | 1301 Guerrero St | revision to pa# 202010146482. field revision at 1st floor. replace concrete foundation with slab,Details
revision to pa# 202010146482. field revision at 1st floor. replace concrete foundation with slab, | $125,000 | |
| Jan 7, 2019 | Completed final sign-off Sep 2019 | 3759 16th St | Dollard Construction Inc. | dry rot repair / retrofit to rear cantilever floor beams at 4 locationsDetails
dry rot repair / retrofit to rear cantilever floor beams at 4 locations | $10,000 |
| Oct 12, 2017 | Completed final sign-off Nov 2017 | 75 Landers St | Klaus Kubler Construction | foundation underpinning: replacement of two post with new concrete pad in laundry area and at walkway to backyard. both locations at ground level.Details
foundation underpinning: replacement of two post with new concrete pad in laundry area and at walkway to backyard. both locations at ground level. | $14,600 |
| Nov 21, 2016 | Completed final sign-off Jun 2017 | 60 Porter St | foundation underpinningDetails
foundation underpinning | $10,000 | |
| Oct 20, 2016 | Completed final sign-off May 2019 | 1410 Montgomery St | revision to 201607152490 to comply with planning dept request for structural changes & additional demolition due to structural inadequacy.; comply with nov 201634801.Details
revision to 201607152490 to comply with planning dept request for structural changes & additional demolition due to structural inadequacy.; comply with nov 201634801. | $40,000 | |
| Jul 15, 2016 | Completed final sign-off May 2019 | 1410 Montgomery St | revision pa 2014-1002-7922 (s1) - change (e) poorly constructed joists to new tji joists, reconstruct 3-side walls with new 2x6 framing. front wall remains the same. no changes to shear walls and foundation & bearing walls. fire rated wall assembly changed to a new rated wall.Details
revision pa 2014-1002-7922 (s1) - change (e) poorly constructed joists to new tji joists, reconstruct 3-side walls with new 2x6 framing. front wall remains the same. no changes to shear walls and foundation & bearing walls. fire rated wall assembly changed to a new rated wall. | ||
| May 10, 2016 | Completed final sign-off Oct 2016 | 294 Carl St | G. A. Delly Deigner Contractor Ltd. | revision to 2015 1019 0067: change shear wall types & lengths. replace deteriorated foundations. revise foundation anchors per field conditionsDetails
revision to 2015 1019 0067: change shear wall types & lengths. replace deteriorated foundations. revise foundation anchors per field conditions | |
| Feb 29, 2016 | Expired or cancelled withdrawn May 2016 | 294 Carl St | revision to appl #201510190067 - remove lead painted siding, chang eshear wall types & lengths, replace some deteriorated foundations.Details
revision to appl #201510190067 - remove lead painted siding, chang eshear wall types & lengths, replace some deteriorated foundations. | ||
| Jun 3, 2015 | Completed final sign-off Dec 2015 | 3395 Balboa St | Royal Lyon Construction | seismic retrofit at garage level walls per sf ordinance 66-13.. sfbc chapter 34b and 2012 iebc appendix a-4Details
seismic retrofit at garage level walls per sf ordinance 66-13.. sfbc chapter 34b and 2012 iebc appendix a-4 | $90,864 |
| Apr 15, 2015 | Completed final sign-off Jun 2016 | 1734 Bay St | Haephus Construction | unit #102- support two joists with header & beam. n/a maher ordinance. remove walls per plans.Details
unit #102- support two joists with header & beam. n/a maher ordinance. remove walls per plans. | $4,000 |
| Mar 16, 2015 | Completed final sign-off Jun 2015 | 432 39th Av | Hong Shink Construction | remove wall between kitchen and dining room. replace kitchen cabinets & countertops, update electrical in kitchen. add new lighting, electrical under separate permit.Details
remove wall between kitchen and dining room. replace kitchen cabinets & countertops, update electrical in kitchen. add new lighting, electrical under separate permit. | $3,000 |
| Aug 24, 2005 | Never finaled issued Aug 2005, no final | 436 Elizabeth St | rev.to appl#200311200776 to show as built per nov.Details
rev.to appl#200311200776 to show as built per nov. | $5,000 | |
| Apr 14, 2004 | Expired or cancelled expired Jan 2008 | 343 Paul Av | enclose existing stair, extend bldg line to front property line with roof, provide handicape restroom in back in 1st floor.Details
enclose existing stair, extend bldg line to front property line with roof, provide handicape restroom in back in 1st floor. | $35,000 |