Behruz Vahdani Sanavi
- Listed as
- authorized agent-others, contractor, designer, engineer
- Firm
- U S Prime Contractor Inc
- Based in
- Laguna Niguel
- On San Francisco permits
- Jul 2011 to Aug 2026
368 permits since 2000 (contractor on 366 permits, engineer on 4 permits, authorized agent-others on 1 permit, designer on 1 permit): 311 completed, 3 in progress, 40 never finaled, 14 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 368.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 24, 2026 | In progress issued Oct 2026 | 563 Sutter St | U S Prime Contractor Inc | revision to permit 202607144975. addition of 3 new massage rooms.Details
revision to permit 202607144975. addition of 3 new massage rooms. | $2,000 |
| Jul 14, 2026 | In progress issued Aug 2026 | 563 Sutter St | U S Prime Contractor Inc | massage parlor tenant improvementDetails
massage parlor tenant improvement | $50,000 |
| Apr 10, 2026 | Completed final sign-off Jun 2026 | 712 Sansome St | U S Prime Contractor Inc | seismic alteration and removal of existing mezzanine the building is vacant, accessiblity under ab-017.Details
seismic alteration and removal of existing mezzanine the building is vacant, accessiblity under ab-017. | $60,000 |
| Jan 27, 2026 | In progress issued Feb 2026 | 2301 Larkin St | stucco repair on east and south elevationsDetails
stucco repair on east and south elevations | $3,000 | |
| Sep 4, 2025 | Completed final sign-off Dec 2025 | 1177 California St | U S Prime Contractor Inc | unit 525: water damage repair, including demo and remaining carpet, wet drywall. new drywall in affected areas, new carpet, vanity installation, and bathroom cabinets and tile.Details
unit 525: water damage repair, including demo and remaining carpet, wet drywall. new drywall in affected areas, new carpet, vanity installation, and bathroom cabinets and tile. | $49,000 |
| Sep 4, 2025 | Completed final sign-off Dec 2025 | 1177 California St | U S Prime Contractor Inc | unit 528: water damage repair, including demo drywall, cabinet in kitchen & bathroom, carpet & paint.Details
unit 528: water damage repair, including demo drywall, cabinet in kitchen & bathroom, carpet & paint. | $49,000 |
| Jul 7, 2025 | Completed final sign-off Aug 2025 | 2256 Market St | U S Prime Contractor Inc | detail change per approved application 2025-0508-6087 & 2025-0508-6089. commercial space is vacant, accessibility under ab-017.Details
detail change per approved application 2025-0508-6087 & 2025-0508-6089. commercial space is vacant, accessibility under ab-017. | |
| May 8, 2025 | Completed final sign-off Aug 2025 | 2256 Market St | U S Prime Contractor Inc | residential: mandatory soft-story seismic retrofit per sfbc 2013 oridinalc 66-13. commercial space vacant; accessibility under ab-017Details
residential: mandatory soft-story seismic retrofit per sfbc 2013 oridinalc 66-13. commercial space vacant; accessibility under ab-017 | $60,000 |
| May 8, 2025 | Completed final sign-off Aug 2025 | 2256 Market St | U S Prime Contractor Inc | commericial: mandatory soft-story seismic retrofit per sfbc 2013 oridinalc 66-13. commercial space vacant; accessibility under ab-017Details
commericial: mandatory soft-story seismic retrofit per sfbc 2013 oridinalc 66-13. commercial space vacant; accessibility under ab-017 | $40,000 |
| Sep 20, 2024 | Completed final sign-off Apr 2025 | 532 Sutter St | U S Prime Contractor Inc | sidewalk repairDetails
sidewalk repair | $80,000 |
| Aug 20, 2024 | Completed final sign-off Nov 2024 | 1411 Mason St | U S Prime Contractor Inc | voluntary concrete wall to support deteriorated floor joists and stud wall and protect against water infiltration at south/west side of basement.Details
voluntary concrete wall to support deteriorated floor joists and stud wall and protect against water infiltration at south/west side of basement. | $30,000 |
| Aug 5, 2024 | Completed final sign-off Jan 2025 | 20 San Antonio Pl | U S Prime Contractor Inc | repair work per nov# 202417877; repair cracks on concrete wall in the basement repair wall in the basement adding plywood and new stucco, remove and replace four basement exterior steel columns which are corrected with new steel colums add pad ftgs uner the new postsDetails
repair work per nov# 202417877; repair cracks on concrete wall in the basement repair wall in the basement adding plywood and new stucco, remove and replace four basement exterior steel columns which are corrected with new steel colums add pad ftgs uner the new posts | $30,000 |
| Jul 8, 2024 | Completed final sign-off Dec 2025 | 1500 Franklin St | U S Prime Contractor Inc | side walk repairDetails
side walk repair | $50,000 |
| Jun 20, 2024 | Completed final sign-off Apr 2025 | 969 Valencia St | U S Prime Contractor Inc | seismic retrofit to entire building.Details
seismic retrofit to entire building. | $80,000 |
| Mar 14, 2024 | Completed final sign-off Jan 2025 | 786 Geary St | U S Prime Contractor Inc | concrete repair at rear(north) elevation.Details
concrete repair at rear(north) elevation. | $10,000 |
| Jan 8, 2024 | Completed final sign-off Sep 2024 | 1080 Francisco St | U S Prime Contractor Inc | voluntary seismic upgrade at the garage level.Details
voluntary seismic upgrade at the garage level. | $119,000 |
| Sep 27, 2023 | Completed final sign-off Jan 2025 | 400 Shrader St | U S Prime Contractor Inc | voluntary structural strengthening, add plywood sheathing at crawl space and mudsill anchor boltsDetails
voluntary structural strengthening, add plywood sheathing at crawl space and mudsill anchor bolts | $25,000 |
| Sep 19, 2023 | Completed final sign-off Feb 2024 | 1585 Waller St | U S Prime Contractor Inc | revision to permit 202301311070. detail change to voluntary structural work in the crawl space strengthening the existing foundation.Details
revision to permit 202301311070. detail change to voluntary structural work in the crawl space strengthening the existing foundation. | |
| Sep 19, 2023 | Completed final sign-off Apr 2024 | 737 Pine St | U S Prime Contractor Inc | concrete repair of slab & beams @ lower garage ceiling, form 8 to form 3 conversion, p. chan reviewed/commented at counter, dmj 10/13/2023;Details
concrete repair of slab & beams @ lower garage ceiling, form 8 to form 3 conversion, p. chan reviewed/commented at counter, dmj 10/13/2023; | $50,000 |
| Sep 19, 2023 | Completed final sign-off Dec 2023 | 2355 Leavenworth St | U S Prime Contractor Inc | install new ledger to existing retaining wall to hold deck joists. repair concrete spalling of existing retaining wall at upper garage level.Details
install new ledger to existing retaining wall to hold deck joists. repair concrete spalling of existing retaining wall at upper garage level. | $15,000 |
| Jun 23, 2023 | Completed final sign-off Nov 2023 | 105 Lakeview Av | U S Prime Contractor Inc | revision to pa# 202303163824, new foundation along gl 1.Details
revision to pa# 202303163824, new foundation along gl 1. | |
| Jun 5, 2023 | Completed final sign-off Oct 2023 | 2355 Leavenworth St | U S Prime Contractor Inc | voluntary seismic work to correct vertical discontinuity in the rear section of non-ductile concrete building.Details
voluntary seismic work to correct vertical discontinuity in the rear section of non-ductile concrete building. | $60,000 |
| May 17, 2023 | Completed final sign-off Aug 2024 | 1541 Grant Av | U S Prime Contractor Inc | units 1541 & 1543: mandatory soft story seismic retrofit per sfbc 2013 ord 66-13 (commercial)Details
units 1541 & 1543: mandatory soft story seismic retrofit per sfbc 2013 ord 66-13 (commercial) | $25,000 |
| May 17, 2023 | Completed final sign-off Aug 2024 | 1539 Grant Av | U S Prime Contractor Inc | units: 1539, 1545a & 1545: mandatory soft story seismic retrofit per sfbc 2013 ord 66-13 (residential)Details
units: 1539, 1545a & 1545: mandatory soft story seismic retrofit per sfbc 2013 ord 66-13 (residential) | $75,000 |
| Mar 16, 2023 | Completed final sign-off Nov 2023 | 105 Lakeview Av | U S Prime Contractor Inc | voluntary seismic retrofit. strengthen (e) beam at 2nd floor framing. remove and replace 2 post at 1st floorDetails
voluntary seismic retrofit. strengthen (e) beam at 2nd floor framing. remove and replace 2 post at 1st floor | $25,000 |
| Mar 15, 2023 | Completed final sign-off Apr 2023 | 524 Guerrero St | U S Prime Contractor Inc | exterior stairs repair stairs (work related) are at the rear and sides (light wells) less than 50%Details
exterior stairs repair stairs (work related) are at the rear and sides (light wells) less than 50% | $2,000 |
| Jan 31, 2023 | Completed final sign-off Feb 2024 | 1585 Waller St | U S Prime Contractor Inc | work in the partial basement and crawl space strenghtening the existing foundation. building repair per kpff reportDetails
work in the partial basement and crawl space strenghtening the existing foundation. building repair per kpff report | $40,000 |
| Dec 28, 2022 | Completed final sign-off Jul 2023 | 1130 Larkin St | U S Prime Contractor Inc | concrete repair on rear facade, north and south facade.Details
concrete repair on rear facade, north and south facade. | $20,000 |
| Nov 15, 2022 | Completed final sign-off Feb 2023 | 216 04th Av | U S Prime Contractor Inc | detail changes to approved pa# 202203230650Details
detail changes to approved pa# 202203230650 | |
| Oct 13, 2022 | Completed final sign-off Oct 2022 | 3430 Geary Bl | U S Prime Contractor Inc | revision to 2022-0601-5353 to establish massage establishment, as well as chair/ foot massage. both uses are permitted iin section 739 geary blvd nc.Details
revision to 2022-0601-5353 to establish massage establishment, as well as chair/ foot massage. both uses are permitted iin section 739 geary blvd nc. | |
| Sep 29, 2022 | Completed final sign-off Oct 2022 | 815 Mason St | U S Prime Contractor Inc | revision to approved app 202002275562. sw relocation and new fndsDetails
revision to approved app 202002275562. sw relocation and new fnds | |
| Sep 29, 2022 | Completed final sign-off Nov 2022 | 1545 Greenwich St | U S Prime Contractor Inc | structural bracing of existing brick chimney at rear of building 2nd and 3rd floors.Details
structural bracing of existing brick chimney at rear of building 2nd and 3rd floors. | $8,000 |
| Sep 29, 2022 | Completed final sign-off Nov 2022 | 1539 Greenwich St | U S Prime Contractor Inc | removal and replacement of e brick chimney at rear of building from 1st to 3rd flsDetails
removal and replacement of e brick chimney at rear of building from 1st to 3rd fls | $25,000 |
| Aug 26, 2022 | Completed final sign-off Oct 2022 | 3430 Geary Bl | U S Prime Contractor Inc | restroom dimension detail changes to approved bpa 202206015353Details
restroom dimension detail changes to approved bpa 202206015353 | |
| Aug 26, 2022 | Completed final sign-off Oct 2022 | 1300 26th Av | U S Prime Contractor Inc | detail change to approved pa# 2022-0601-5349.Details
detail change to approved pa# 2022-0601-5349. | |
| Jun 15, 2022 | Completed final sign-off Oct 2022 | 2618 26th Av | U S Prime Contractor Inc | bay window strengthening in front section of the building.Details
bay window strengthening in front section of the building. | $10,000 |
| Jun 1, 2022 | Completed final sign-off Oct 2022 | 3430 Geary Bl | U S Prime Contractor Inc | ti work for massage space. no plumbing & mechanical work.Details
ti work for massage space. no plumbing & mechanical work. | $5,000 |
| Jun 1, 2022 | Completed final sign-off Jun 2022 | 1388 California St | U S Prime Contractor Inc | to obtain final inspection for work approved under pa# 201501307166. all work is complete.Details
to obtain final inspection for work approved under pa# 201501307166. all work is complete. | |
| Jun 1, 2022 | Completed final sign-off Oct 2022 | 1300 26th Av | U S Prime Contractor Inc | repair 9 columns in the garage areaDetails
repair 9 columns in the garage area | $36,000 |
| May 25, 2022 | Completed final sign-off Jun 2022 | 1388 California St | U S Prime Contractor Inc | to obtain final inspection for work approved under pa# 201704144005. all work is complete.Details
to obtain final inspection for work approved under pa# 201704144005. all work is complete. | |
| May 11, 2022 | Expired or cancelled cancelled Mar 2023 | 1388 California St | U S Prime Contractor Inc | to obtain final inspection for work approved under permit application(s) 201501307116, 202001293015, 201704144005. all work is complete.Details
to obtain final inspection for work approved under permit application(s) 201501307116, 202001293015, 201704144005. all work is complete. | |
| Mar 23, 2022 | Completed final sign-off Feb 2023 | 216 04th Av | U S Prime Contractor Inc | mandatory soft story seismic retrofit per sfbc 2019, ordinance 96-13 spft story retrofit per chapter 4d 2016 cebc, appendix a-4Details
mandatory soft story seismic retrofit per sfbc 2019, ordinance 96-13 spft story retrofit per chapter 4d 2016 cebc, appendix a-4 | $153,000 |
| Mar 11, 2022 | Completed final sign-off May 2022 | 250 Fell St | U S Prime Contractor Inc | unit 24: repair of (1) columnDetails
unit 24: repair of (1) column | $5,000 |
| Mar 11, 2022 | Completed final sign-off May 2022 | 2345 Polk St | U S Prime Contractor Inc | bay windows volunteery strengthening in rear section of buildingDetails
bay windows volunteery strengthening in rear section of building | $69,000 |
| Nov 23, 2021 | Completed final sign-off Jun 2022 | 1649 Market St | U S Prime Contractor Inc | detail changes to approved permit 2021 0929 9438Details
detail changes to approved permit 2021 0929 9438 | |
| Oct 28, 2021 | Completed final sign-off Aug 2022 | 888 Folsom St | U S Prime Contractor Inc | voluntary siesmic upgrade. roof rafter connection to extg perimeter concrete wall.Details
voluntary siesmic upgrade. roof rafter connection to extg perimeter concrete wall. | $10,000 |
| Sep 29, 2021 | Completed final sign-off Jun 2022 | 1649 Market St | U S Prime Contractor Inc | umb building seismic retrofitting, full compliance, special procedureDetails
umb building seismic retrofitting, full compliance, special procedure | $350,000 |
| Jul 8, 2021 | Completed final sign-off Jul 2021 | 4320 California St | U S Prime Contractor Inc | renew permit application# 2015-1006-8893 and 2016-0907-6946 for final inspection.Details
renew permit application# 2015-1006-8893 and 2016-0907-6946 for final inspection. | |
| Jul 8, 2021 | Completed final sign-off Jul 2021 | 4330 California St | U S Prime Contractor Inc | renew permit application# 2015-1006-8896 and 2015-1006-8897 for final inspection.Details
renew permit application# 2015-1006-8896 and 2015-1006-8897 for final inspection. | |
| Jun 18, 2021 | Completed final sign-off Apr 2023 | 1830 Jackson St | Muldoon Construction Inc | unit i: remodel/enlargement by incorporating (e) storage space, addition of (1) bathroom & (1) bedroom, remodel (e) bathroom & (e) kitchen, replace two windows facing court.Details
unit i: remodel/enlargement by incorporating (e) storage space, addition of (1) bathroom & (1) bedroom, remodel (e) bathroom & (e) kitchen, replace two windows facing court. | $200,000 |
| Jun 4, 2021 | Completed final sign-off Sep 2021 | 291 Geary St | U S Prime Contractor Inc | brick wall opening on 7th floorDetails
brick wall opening on 7th floor | $3,000 |
| May 11, 2021 | Completed final sign-off Oct 2021 | 1102 Valencia St | U S Prime Contractor Inc | (commercial) voluntary soft story retrofit per sfbc 209, ord. 66-13. 2019 cebc, appendix a-4. commercial spaces are vacant, accessibility under ab-017.Details
(commercial) voluntary soft story retrofit per sfbc 209, ord. 66-13. 2019 cebc, appendix a-4. commercial spaces are vacant, accessibility under ab-017. | |
| May 11, 2021 | Completed final sign-off Oct 2021 | 1106 Valencia St | U S Prime Contractor Inc | (residential) voluntary soft story retrofit per sfbc 209, ord. 66-13. 2019 cebc, appendix a-4. commercial spaces are vacant, accessibility under ab-017.Details
(residential) voluntary soft story retrofit per sfbc 209, ord. 66-13. 2019 cebc, appendix a-4. commercial spaces are vacant, accessibility under ab-017. | $105,000 |
| Nov 30, 2020 | Completed final sign-off Feb 2021 | 160 Portola Dr | U S Prime Contractor Inc | repair rear stair at the back of the building. 50% repairDetails
repair rear stair at the back of the building. 50% repair | $3,000 |
| Oct 7, 2020 | Completed final sign-off Mar 2021 | 956 Valencia St | U S Prime Contractor Inc | soft story revision to pa# 202002255308. ada accessibility under pa# 202002255310.Details
soft story revision to pa# 202002255308. ada accessibility under pa# 202002255310. | |
| Oct 2, 2020 | Completed final sign-off Oct 2020 | 1553 Pine St | U S Prime Contractor Inc | to obtain a final inspection for work approved under permit application #201510260808; all work is completeDetails
to obtain a final inspection for work approved under permit application #201510260808; all work is complete | |
| Oct 2, 2020 | Completed final sign-off Oct 2020 | 1553 Pine St | U S Prime Contractor Inc | to obtain final inspection for work approved under permit application's #201510260804 and #201512225702; all work is completeDetails
to obtain final inspection for work approved under permit application's #201510260804 and #201512225702; all work is complete | |
| Sep 17, 2020 | Completed final sign-off Jun 2022 | 1388 California St | U S Prime Contractor Inc | revision to 201501307116. detail changeDetails
revision to 201501307116. detail change | |
| Sep 16, 2020 | Completed final sign-off Oct 2020 | 2849 California St | U S Prime Contractor Inc | detail change to approved application 201906204021Details
detail change to approved application 201906204021 | |
| Sep 14, 2020 | Completed final sign-off Feb 2021 | 160 Portola Dr | U S Prime Contractor Inc | install (2) columns & footings to reinforce (e) columnsDetails
install (2) columns & footings to reinforce (e) columns | $10,000 |
| Jul 6, 2020 | Never finaled issued Jul 2020, no final | 847 Divisadero St | U S Prime Contractor Inc | revision to app#201806071211 to eliminate one of the proposed power actuated doors. ref pa 201903195595.Details
revision to app#201806071211 to eliminate one of the proposed power actuated doors. ref pa 201903195595. | |
| Jul 6, 2020 | Completed final sign-off Feb 2021 | 450 Castro St | U S Prime Contractor Inc | detail change to approved application no 201610130142; adding new retaining wall in basement , change the steel frames from hardy frame to standard steel monent frame, fixing the ground floor in the back due to water leakDetails
detail change to approved application no 201610130142; adding new retaining wall in basement , change the steel frames from hardy frame to standard steel monent frame, fixing the ground floor in the back due to water leak | $10,000 |
| Jul 2, 2020 | Completed final sign-off Aug 2020 | 833 Divisadero St | U S Prime Contractor Inc | detail change to approved application 201806071190/1209 commercial: eliminate one of the proposed power actuated doors.Details
detail change to approved application 201806071190/1209 commercial: eliminate one of the proposed power actuated doors. | |
| Jun 12, 2020 | Never finaled issued Aug 2020, no final | 2226 Divisadero St | U S Prime Contractor Inc | revison-detail change to approved application 2020/0108/1440. relocation of front and middle steel frames. revision of steel frame attachment to structure. revision of collector details. revision of simpson shear wall to traditional shear wall with hdus.Details
revison-detail change to approved application 2020/0108/1440. relocation of front and middle steel frames. revision of steel frame attachment to structure. revision of collector details. revision of simpson shear wall to traditional shear wall with hdus. | |
| Feb 27, 2020 | Completed final sign-off Oct 2022 | 815 Mason St | U S Prime Contractor Inc | voluntary seismic retrofit.Details
voluntary seismic retrofit. | $52,000 |
| Feb 25, 2020 | Completed final sign-off May 2022 | 947 Page St | U S Prime Contractor Inc | mandatory soft story seismic retrofit per sfbc 2016 chapter 4d, ordiance 66-13. 2016 cebc appendix a-4. - adu for future on separate permitDetails
mandatory soft story seismic retrofit per sfbc 2016 chapter 4d, ordiance 66-13. 2016 cebc appendix a-4. - adu for future on separate permit | $67,500 |
| Feb 25, 2020 | Completed final sign-off Mar 2021 | 956 Valencia St | U S Prime Contractor Inc | to comply with nov #201813192. commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential pa #202002255308 this is also an existing bathroom upgrade to ada complianceDetails
to comply with nov #201813192. commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential pa #202002255308 this is also an existing bathroom upgrade to ada compliance | $25,000 |
| Feb 25, 2020 | Completed final sign-off Mar 2021 | 956 Valencia St | U S Prime Contractor Inc | to comply with nov #201813192. residential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial pa #202002255310. these drawings also include an ada bathroom upgradeDetails
to comply with nov #201813192. residential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial pa #202002255310. these drawings also include an ada bathroom upgrade | $25,000 |
| Feb 12, 2020 | Completed final sign-off Feb 2020 | 2529 San Bruno Av | U S Prime Contractor Inc | ref pa# 201808036421; detail change to approved permit 201808036421, relocation of automatic door openingDetails
ref pa# 201808036421; detail change to approved permit 201808036421, relocation of automatic door opening | |
| Jan 29, 2020 | Completed final sign-off Jan 2020 | 2350 Washington St | U S Prime Contractor Inc | to obtain final inspection for work approved under pa 201709127778. all work is completeDetails
to obtain final inspection for work approved under pa 201709127778. all work is complete | |
| Jan 29, 2020 | Completed final sign-off Jul 2020 | 2160 Van Ness Av | U S Prime Contractor Inc | revision to pa #2018-0829-8622: detail change to approved plans, mandatory soft story. review shear wall line 3.6 between "d" & "e"Details
revision to pa #2018-0829-8622: detail change to approved plans, mandatory soft story. review shear wall line 3.6 between "d" & "e" | |
| Jan 29, 2020 | Completed final sign-off Apr 2020 | 1874 Market St | U S Prime Contractor Inc | revision to pa # 2019-1118-7574: detail change to mandatory soft storyDetails
revision to pa # 2019-1118-7574: detail change to mandatory soft story | |
| Jan 29, 2020 | Never finaled issued Jan 2020, no final | 1388 California St | U S Prime Contractor Inc | recommencement and completion of work approved under pa's 201501307116 & 201704144005Details
recommencement and completion of work approved under pa's 201501307116 & 201704144005 | $11,700 |
| Jan 29, 2020 | Completed final sign-off Jul 2020 | 246 Powell St | U S Prime Contractor Inc | structural detail for ti workDetails
structural detail for ti work | $3,000 |
| Jan 8, 2020 | Completed final sign-off Jul 2020 | 2226 Divisadero St | U S Prime Contractor Inc | mandatory soft story seismic retrofit per sfbc 2016 ord 66-13 2016 cebc appendix a4Details
mandatory soft story seismic retrofit per sfbc 2016 ord 66-13 2016 cebc appendix a4 | $94,000 |
| Jan 7, 2020 | Never finaled issued Jan 2020, no final | 2160 Van Ness Av | U S Prime Contractor Inc | street spaceDetails
street space | |
| Jan 7, 2020 | Never finaled issued Jan 2020, no final | 550 Buchanan St | U S Prime Contractor Inc | street spaceDetails
street space | |
| Dec 5, 2019 | Never finaled issued Dec 2019, no final | 548 Broadway | U S Prime Contractor Inc | detail change to aproved app#201909272929 for soft storyDetails
detail change to aproved app#201909272929 for soft story | |
| Dec 4, 2019 | Completed final sign-off Aug 2020 | 890 Filbert St | U S Prime Contractor Inc | side walk repair per nov 1183239Details
side walk repair per nov 1183239 | $119,000 |
| Dec 4, 2019 | Completed final sign-off Sep 2020 | 550 Buchanan St | U S Prime Contractor Inc | detail change to approved application 201911066639Details
detail change to approved application 201911066639 | |
| Nov 19, 2019 | Never finaled issued Feb 2020, no final | 550 Buchanan St | U S Prime Contractor Inc | streetspaceDetails
streetspace | |
| Nov 18, 2019 | Completed final sign-off Apr 2020 | 1874 Market St | U S Prime Contractor Inc | revision to app#201911046395 for mandatory soft story for detail changesDetails
revision to app#201911046395 for mandatory soft story for detail changes | |
| Nov 6, 2019 | Completed final sign-off Sep 2020 | 550 Buchanan St | U S Prime Contractor Inc | recommencent and completion of work approved under 201509015757Details
recommencent and completion of work approved under 201509015757 | |
| Nov 4, 2019 | Completed final sign-off Dec 2019 | 2514 Polk St | U S Prime Contractor Inc | revision to pa 2019-0508-0119 (soft story) detail changeDetails
revision to pa 2019-0508-0119 (soft story) detail change | |
| Nov 4, 2019 | Completed final sign-off Apr 2020 | 1874 Market St | U S Prime Contractor Inc | structural detail change to approved app 201908169053Details
structural detail change to approved app 201908169053 | |
| Nov 4, 2019 | Completed final sign-off Feb 2020 | 2529 San Bruno Av | U S Prime Contractor Inc | detail change to approved application 201909091077 relocation of steel frame #1Details
detail change to approved application 201909091077 relocation of steel frame #1 | |
| Nov 4, 2019 | Completed final sign-off Jan 2020 | 2145 Franklin St | U S Prime Contractor Inc | detail change to approved application 2019-0424-8791Details
detail change to approved application 2019-0424-8791 | |
| Nov 4, 2019 | Completed final sign-off Jul 2020 | 1618 Polk St | U S Prime Contractor Inc | revision to pa 2019-0618-3732 (soft story) detail changeDetails
revision to pa 2019-0618-3732 (soft story) detail change | |
| Oct 2, 2019 | Completed final sign-off Oct 2019 | 270 26th Av | U S Prime Contractor Inc | renew permit 201705106202 for final inspection. all work completeDetails
renew permit 201705106202 for final inspection. all work complete | |
| Sep 27, 2019 | Never finaled issued Oct 2019, no final | 554 Broadway | U S Prime Contractor Inc | residential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. (commecial soft story pa #201909272929) maher naDetails
residential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. (commecial soft story pa #201909272929) maher na | $66,000 |
| Sep 27, 2019 | Never finaled issued Oct 2019, no final | 548 Broadway | U S Prime Contractor Inc | commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. (residential soft story pa #201909272927) maher naDetails
commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. (residential soft story pa #201909272927) maher na | $33,000 |
| Sep 26, 2019 | Completed final sign-off Jun 2020 | 118 Steiner St | U S Prime Contractor Inc | revision to pa #201708023624. detail change to approved soft story permit. replace siding on germania st (partial ground floor)Details
revision to pa #201708023624. detail change to approved soft story permit. replace siding on germania st (partial ground floor) | |
| Sep 9, 2019 | Completed final sign-off Feb 2020 | 2529 San Bruno Av | U S Prime Contractor Inc | revision to app#201808036422 for shear wall at lobby. soft story retrofit per sfebc chapter 4d; 2016 cebc appendix a-4Details
revision to app#201808036422 for shear wall at lobby. soft story retrofit per sfebc chapter 4d; 2016 cebc appendix a-4 | |
| Sep 9, 2019 | Completed final sign-off Nov 2019 | 2635 Mcallister St | U S Prime Contractor Inc | revision to app#201907176092. relocation of steel frame #1. soft story retorfit per sfebc chapter 4d, 2016 cebc appendix a-4Details
revision to app#201907176092. relocation of steel frame #1. soft story retorfit per sfebc chapter 4d, 2016 cebc appendix a-4 | |
| Aug 26, 2019 | Completed final sign-off Aug 2019 | 1600 Haight St | U S Prime Contractor Inc | detail change to approved plan #201803284800. relocation of automatic door opener.Details
detail change to approved plan #201803284800. relocation of automatic door opener. | |
| Aug 23, 2019 | Completed final sign-off Jan 2020 | 2145 Franklin St | U S Prime Contractor Inc | install new garage door in (e) opening. no change to the opening size. (n) door to match (e) neighboring door. automatic door moedl #24.Details
install new garage door in (e) opening. no change to the opening size. (n) door to match (e) neighboring door. automatic door moedl #24. | $5,000 |
| Aug 16, 2019 | Completed final sign-off Apr 2020 | 1874 Market St | U S Prime Contractor Inc | mandatory soft story retrofit per sfbc 2016 ord 66-13 2016 ecbe appx a4 commercialDetails
mandatory soft story retrofit per sfbc 2016 ord 66-13 2016 ecbe appx a4 commercial | $27,000 |
| Aug 16, 2019 | Completed final sign-off Apr 2020 | 1878 Market St | U S Prime Contractor Inc | mandatory soft story retrofit per sfbc 2016 ord 66-13 2016 ecbe appx a4 residentialDetails
mandatory soft story retrofit per sfbc 2016 ord 66-13 2016 ecbe appx a4 residential | $81,000 |
| Aug 15, 2019 | Completed final sign-off Mar 2021 | 291 Geary St | U S Prime Contractor Inc | brick wall opening on 4th fl, and one ada accessible bathroom.Details
brick wall opening on 4th fl, and one ada accessible bathroom. | $5,000 |
| Aug 14, 2019 | Completed final sign-off Aug 2020 | 2849 California St | U S Prime Contractor Inc | detail change to approved application 201809140285 n/a maherDetails
detail change to approved application 201809140285 n/a maher |