Barbara Chambers
- Listed as
- architect, engineer
- Firm
- Chambers & Chambers
- On San Francisco permits
- Aug 2005 to Dec 2024
11 permits since 2000 (architect on 10 permits, engineer on 1 permit): 9 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 31, 2024 | In progress filed Dec 2024, not yet issued | 2850 Lake St | interior, limited structural remodel at 1st and 2nd floor . replace all windows (facing street) (n) lighting and plumbing upgrades. no additions or change to building envelope massing.Details
interior, limited structural remodel at 1st and 2nd floor . replace all windows (facing street) (n) lighting and plumbing upgrades. no additions or change to building envelope massing. | $150,000 | |
| Nov 22, 2019 | Completed final sign-off May 2021 | 100 Commonwealth Av | Forma Construction | revision to approved permit #2019.0222.3596. to rectify discrepancy in window manufacturers between #201812219048 and #201902223596, and to replace (e) single pane wood windows with marvin wood ultimate dual pane wood windows in kind. 36 windows and 2 balcony doors.Details
revision to approved permit #2019.0222.3596. to rectify discrepancy in window manufacturers between #201812219048 and #201902223596, and to replace (e) single pane wood windows with marvin wood ultimate dual pane wood windows in kind. 36 windows and 2 balcony doors. | |
| Mar 13, 2019 | Completed final sign-off May 2022 | 2547 Lyon St | legalization of one dwelling unit @ the 1st fl. per ordinance 43-14. provide egress from bedroom & compliant bath. no change to (e) envelope. remodel of entire building with minor addition & structural upgrades under separate permit #2018/0808/6861Details
legalization of one dwelling unit @ the 1st fl. per ordinance 43-14. provide egress from bedroom & compliant bath. no change to (e) envelope. remodel of entire building with minor addition & structural upgrades under separate permit #2018/0808/6861 | $50,000 | |
| Feb 22, 2019 | Completed final sign-off May 2021 | 100 Commonwealth Av | Forma Construction | basement, 1st, 2nd flrs. includes interior demo, new stairs, relocaton of bathrooms, new windows 2 @ west facade, 2 @ east facade, 6 @ north facade w/ (n) door and porch. replacement of non-street facing window sash and door, no external work in front of building, ,Details
basement, 1st, 2nd flrs. includes interior demo, new stairs, relocaton of bathrooms, new windows 2 @ west facade, 2 @ east facade, 6 @ north facade w/ (n) door and porch. replacement of non-street facing window sash and door, no external work in front of building, , | $175,000 |
| Dec 21, 2018 | Completed final sign-off May 2021 | 100 Commonwealth Av | Forma Construction | horizontal addition. 46 sq ft addition at rear facade of 2/fl. addition space for bathroom.Details
horizontal addition. 46 sq ft addition at rear facade of 2/fl. addition space for bathroom. | $20,000 |
| Aug 8, 2018 | Completed final sign-off May 2022 | 2545 Lyon St | complete interior remodel, small addition for (n) stairs, reconfigure stairs & elevator shaft, (n) sprinklers throughout both unitsDetails
complete interior remodel, small addition for (n) stairs, reconfigure stairs & elevator shaft, (n) sprinklers throughout both units | $2,000,000 | |
| Jun 9, 2017 | Completed final sign-off Jun 2017 | 2205 Scott St | Upscale Construction Inc. | voluntary strengthening. add ancho bolts to (e) sole plate to (e) foundation.Details
voluntary strengthening. add ancho bolts to (e) sole plate to (e) foundation. | $5,000 |
| Apr 6, 2017 | Completed final sign-off Dec 2017 | 2205 Scott St | Upscale Construction Inc. | interior remodel, remodel kitchen & powder room @ 2nd floor. remodel bathrooms @ 3rd floor. replace in-kind. no structural alterations.Details
interior remodel, remodel kitchen & powder room @ 2nd floor. remodel bathrooms @ 3rd floor. replace in-kind. no structural alterations. | $300,000 |
| Aug 14, 2012 | Completed final sign-off Oct 2013 | 2310 Hyde St | Ventana 76 | #1- renovation of kitchen, master bedroom suite and minor interior remodel.Details
#1- renovation of kitchen, master bedroom suite and minor interior remodel. | $250,000 |
| Feb 7, 2007 | Completed final sign-off Dec 2007 | 3201 Clay St | Plath & Company Inc | kichen remodel (florescent lighting). structural upgrade to foundation. removal extg fire place. new wndw to relpalce extg door to replace extg door exterior stairs to basement to be removed to allow reinforcement to foundationDetails
kichen remodel (florescent lighting). structural upgrade to foundation. removal extg fire place. new wndw to relpalce extg door to replace extg door exterior stairs to basement to be removed to allow reinforcement to foundation | $400,000 |
| Aug 3, 2005 | Expired or cancelled expired Jul 2009 | 3355 Jackson St | Gordon Lehman Construction | deck was deleted deck was deletedfororiginal application for stuctural and fire. resistive designDetails
deck was deleted deck was deletedfororiginal application for stuctural and fire. resistive design | $3,000 |