Audrey Tse
- Listed as
- architect
- Firm
- Insite Architecture Design
- Based in
- Eureka
- On San Francisco permits
- Nov 2007 to Sep 2026
7 permits since 2000 (architect on 7 permits): 5 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 8, 2026 | In progress issued Sep 2026 | 1979 09th Av | Hawk Hill Construction Inc | bathroom remodel, 1/2 bath creation, media room creation (320 sq.ft), relocate laundry appliances into garage. add 240 square foot new space on 1st floorDetails
bathroom remodel, 1/2 bath creation, media room creation (320 sq.ft), relocate laundry appliances into garage. add 240 square foot new space on 1st floor | $50,000 |
| Jul 9, 2026 | In progress issued Jul 2026 | 2820 Bush St | Aak Builders Corp | remodel garage. garage door move forward. remove non-structural wall. new footings at garage door and wall to be removed. 7/22/2026Details
remodel garage. garage door move forward. remove non-structural wall. new footings at garage door and wall to be removed. 7/22/2026 | $35,000 |
| Sep 23, 2014 | Completed final sign-off Apr 2015 | 472 Euclid Av | Bluefield Construction | two (2) bathroom remodelsDetails
two (2) bathroom remodels | $22,000 |
| Jun 26, 2014 | Completed final sign-off Apr 2015 | 1519 Larkin St | Bluefield Construction | kitchen & bathroom remodel of lower unit at level above garage level per plan.Details
kitchen & bathroom remodel of lower unit at level above garage level per plan. | $40,000 |
| Apr 10, 2014 | Completed final sign-off Feb 2015 | 1881 15th St | Bluefield Construction | interior remodeling to both units including kitchen & dining room, rebuild rear stair in kind.Details
interior remodeling to both units including kitchen & dining room, rebuild rear stair in kind. | $45,000 |
| Jul 23, 2009 | Completed final sign-off Oct 2010 | 472 Euclid Av | Ming Fa Construction Inc | interior remodel of (e) 2nd. flr. space and 1st. flr. space-2nd. flr.-kitchen remodel-replace counters, sinks, 2-bathrm. remodels-shower, tub, sinks, counters, reconfigure bedrm. spaces. add interior stair connection to 1st. level, 1st. flr. convert unfinished space to add a bedrm., bathrm./laundry,Details
interior remodel of (e) 2nd. flr. space and 1st. flr. space-2nd. flr.-kitchen remodel-replace counters, sinks, 2-bathrm. remodels-shower, tub, sinks, counters, reconfigure bedrm. spaces. add interior stair connection to 1st. level, 1st. flr. convert unfinished space to add a bedrm., bathrm./laundry, | $215,000 |
| Nov 7, 2007 | Completed final sign-off Dec 2007 | 33 Powell St | On Top Construction, Inc. | cutting a door into a corridor and installing steel door and metal stud wall to create a break roomDetails
cutting a door into a corridor and installing steel door and metal stud wall to create a break room | $5,000 |