Ashur Abbasi
- Listed as
- engineer
- On San Francisco permits
- Nov 2013 to Dec 2013
2 permits since 2000 (engineer on 2 permits): 2 completed.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 18, 2013 | Completed final sign-off Aug 2014 | 164 Peralta Av | adding a deck to the back of the house on 2nd floor only. (existing 1st level deck at grade - no change.) convert existing bedroom to home office.Details
adding a deck to the back of the house on 2nd floor only. (existing 1st level deck at grade - no change.) convert existing bedroom to home office. | $10,000 | |
| Nov 22, 2013 | Completed final sign-off Aug 2014 | 164 Peralta Av | remodel kitchen & bathroom & 1/2 bath @ 2nd floor, bedroom addition @ 1st (lower) floor.convert utility room in 1st floor to a bedroom.Details
remodel kitchen & bathroom & 1/2 bath @ 2nd floor, bedroom addition @ 1st (lower) floor.convert utility room in 1st floor to a bedroom. | $30,000 |