Ann Wimsatt
- Listed as
- architect
- On San Francisco permits
- Jul 2023 to Sep 2026
10 permits since 2000 (architect on 10 permits): 6 completed, 2 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 23, 2026 | In progress filed Sep 2026, not yet issued | 315 Amber Dr | remodel of existing 1965 house, including remodel of kitchen, 2 baths and increased height of front rooms on level 2. ground fl addition to fill in existing soft story: extended garage/storage area. new entry and office/bedroom. remodel of existing entry to include new bath and laundry room locationDetails
remodel of existing 1965 house, including remodel of kitchen, 2 baths and increased height of front rooms on level 2. ground fl addition to fill in existing soft story: extended garage/storage area. new entry and office/bedroom. remodel of existing entry to include new bath and laundry room location | $575,000 | |
| Jun 26, 2025 | In progress filed Jun 2025, not yet issued | 483 16th Av | Stonebridge Construction Inc | remove (e) foundation and replace with (n). remove (e) level 1 wood fl and replace with new concrete slab fl at lower elevation. add new interior walls on lower level, along with (n) bath & (n) kitchenette. remove (e) wood stair from lvl 2 & replace with (n) wood stair. (n) conditioned spaceDetails
remove (e) foundation and replace with (n). remove (e) level 1 wood fl and replace with new concrete slab fl at lower elevation. add new interior walls on lower level, along with (n) bath & (n) kitchenette. remove (e) wood stair from lvl 2 & replace with (n) wood stair. (n) conditioned space | $275,000 |
| Oct 8, 2024 | Completed final sign-off Feb 2025 | 483 16th Av | Zuleta Construction | repair (e) double hung wood windows on front facade by removing (e) single pane sashes and replacing them with new customer insulated glass double hung window sashes to match (e), including matching wood ogee and true divided lights. repair (e) front wood door by replacing it with matching new custoDetails
repair (e) double hung wood windows on front facade by removing (e) single pane sashes and replacing them with new customer insulated glass double hung window sashes to match (e), including matching wood ogee and true divided lights. repair (e) front wood door by replacing it with matching new custo | $15,000 |
| Aug 20, 2024 | Expired or cancelled expired Jun 2026 | 1860 24th Av | Iy Development & Renovation Inc | revision to permit 202307111852. removal of a wall and installation of a new beam according to revised plan.Details
revision to permit 202307111852. removal of a wall and installation of a new beam according to revised plan. | $8,000 |
| Jul 24, 2024 | Completed final sign-off May 2025 | 944 Capp St | Stonebridge Construction Inc, Synergy Enterprises Inc. | remodel (e) apartment uit including lower exist. slab. demo of (e) furnace and elimin. of all asbestos and (e) duct. install new mini split heat pump hvac system and elec wiring, new plumbing,insulation, kit cab,framing and furring as drawn. remove (e) chimney and non-load bearing walls.Details
remodel (e) apartment uit including lower exist. slab. demo of (e) furnace and elimin. of all asbestos and (e) duct. install new mini split heat pump hvac system and elec wiring, new plumbing,insulation, kit cab,framing and furring as drawn. remove (e) chimney and non-load bearing walls. | $368,000 |
| Apr 17, 2024 | Completed final sign-off May 2025 | 940 Capp St | Stonebridge Construction Inc | rear structure garage & attic. repair (e) dilapidated wood framing & siding. (n) 1x12 siding to match (e) siding. replace (e) sliding wood garage door with new math wood overhead motorized garage door; install new oh motorized door on courtyard in (e) opening; remove (e) 1 1/2" plywood wall andDetails
rear structure garage & attic. repair (e) dilapidated wood framing & siding. (n) 1x12 siding to match (e) siding. replace (e) sliding wood garage door with new math wood overhead motorized garage door; install new oh motorized door on courtyard in (e) opening; remove (e) 1 1/2" plywood wall and | $40,000 |
| Mar 19, 2024 | Completed final sign-off May 2025 | 940 Capp St | Stonebridge Construction Inc | remodel of (e) apartment unit including demo of (e) furnace and elimination of all asbestos and (e) duct. installation of new ducted heat pump hvac system and new elec wiring, installation of new 200a elec service, subpanels, remove (e) kit cab, remove (e) chimney and non load bearing wall. installDetails
remodel of (e) apartment unit including demo of (e) furnace and elimination of all asbestos and (e) duct. installation of new ducted heat pump hvac system and new elec wiring, installation of new 200a elec service, subpanels, remove (e) kit cab, remove (e) chimney and non load bearing wall. install | $120,000 |
| Feb 28, 2024 | Completed final sign-off Jun 2025 | 942 Capp St | Stonebridge Construction Inc | installation of new hvac system and new elec wiring throughout. installation of new 200 amp elec service and subpanels, installation of new gyp bd dropped ceiling in level-2 hallway, installation of new corner sink in level-2 water closetDetails
installation of new hvac system and new elec wiring throughout. installation of new 200 amp elec service and subpanels, installation of new gyp bd dropped ceiling in level-2 hallway, installation of new corner sink in level-2 water closet | $50,000 |
| Jul 11, 2023 | Completed final sign-off Jun 2026 | 1860 24th Av | Om's Remodeling, Iy Development & Renovation Inc | remodel will increase conditioned area on gr level. enclose e sky well level 2, add new stair, add 2 new skylights, new vinyl windows, doors on rear facade. rebuild rearlower facade wall, new lateral reinforcing, new foundation at rear and midpoint,new hvac,200 amp elec,tankless whDetails
remodel will increase conditioned area on gr level. enclose e sky well level 2, add new stair, add 2 new skylights, new vinyl windows, doors on rear facade. rebuild rearlower facade wall, new lateral reinforcing, new foundation at rear and midpoint,new hvac,200 amp elec,tankless wh | $350,000 |
| Jul 11, 2023 | Expired or cancelled expired Jun 2026 | 1860 24th Av | Om's Remodeling, Iy Development & Renovation Inc | replace existing front windows vinyl with new alum clad wood windows from marvin. windows will be in exact same location, exact same size, exact same configDetails
replace existing front windows vinyl with new alum clad wood windows from marvin. windows will be in exact same location, exact same size, exact same config | $5,000 |