Anh Kim Tran
- Listed as
- architect
- Based in
- San Francisco
- On San Francisco permits
- Mar 2020 to Sep 2026
10 permits since 2000 (architect on 10 permits): 8 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 11, 2026 | In progress filed Sep 2026, not yet issued | 10 Godeus St | reconfigure existing entry stair. new front door and window. new exterior storage door. new light at landing. no change to house footprint. all new elements to match existing architecture. skylight added in atticDetails
reconfigure existing entry stair. new front door and window. new exterior storage door. new light at landing. no change to house footprint. all new elements to match existing architecture. skylight added in attic | $60,000 | |
| Aug 26, 2026 | In progress issued Aug 2026 | 922 Carolina St | Lemus Construction Inc | partial interior renovation: 1st fl. kitchen remodel. relocate e. dishwasher, new wing wall & additional cabinetry, new mechanical exhaust at ranges. replace e. incondesant recessed lighting with new led lighing at kitchen, bedroom & bathroom. add ev charger. replace existing knob & tube wiringDetails
partial interior renovation: 1st fl. kitchen remodel. relocate e. dishwasher, new wing wall & additional cabinetry, new mechanical exhaust at ranges. replace e. incondesant recessed lighting with new led lighing at kitchen, bedroom & bathroom. add ev charger. replace existing knob & tube wiring | $40,000 |
| Jun 25, 2026 | Completed final sign-off Jul 2026 | 30 Rockwood Ct | Sigma Construction Company | revision pa# 202512051070: to eliminate 3 proposed windows and to change size and/or operation of 7 windows.Details
revision pa# 202512051070: to eliminate 3 proposed windows and to change size and/or operation of 7 windows. | |
| Jun 23, 2026 | Completed final sign-off Aug 2026 | 799 Market St | Dpr Construction A | 6th and 7th floors: partial interior tenant remodel at 6th and 7th floors. additional power data, reception area closet reconfiguration. plumbing and electrical included, no mechanical.Details
6th and 7th floors: partial interior tenant remodel at 6th and 7th floors. additional power data, reception area closet reconfiguration. plumbing and electrical included, no mechanical. | $325,000 |
| May 15, 2026 | Completed final sign-off Aug 2026 | 799 Market St | Dpr Construction A | 7/f: partial interior t.i. new partial framed wall and cased opening at storage area. replace select storefront with new interior framed portition. mechanical & electrical included.Details
7/f: partial interior t.i. new partial framed wall and cased opening at storage area. replace select storefront with new interior framed portition. mechanical & electrical included. | $120,000 |
| Mar 23, 2026 | Completed final sign-off Aug 2026 | 1221 Greenwich St | Pro Ge Construction Corp, Brass Tack | unit#7:interior renovation: removal of non-structural int. partition, relocation of (e) gas,(n) electrical outlets, relocation of plumbing, (n) kitchen cabinets and millwork, (n) washer dryer unit. no change to use, occupancy or egress. to comply with nov 202649228.Details
unit#7:interior renovation: removal of non-structural int. partition, relocation of (e) gas,(n) electrical outlets, relocation of plumbing, (n) kitchen cabinets and millwork, (n) washer dryer unit. no change to use, occupancy or egress. to comply with nov 202649228. | $30,000 |
| Dec 5, 2025 | Completed final sign-off Jul 2026 | 30 Rockwood Ct | Sigma Construction Company | renovation of (e) 2 story residence including reconfiguration of internal stair, addition full bath @ 2nd fl; convertion of 1st fl storage area into habitable space & laundry room; new wood deck @ existing rear yardDetails
renovation of (e) 2 story residence including reconfiguration of internal stair, addition full bath @ 2nd fl; convertion of 1st fl storage area into habitable space & laundry room; new wood deck @ existing rear yard | $175,000 |
| Jan 26, 2024 | Completed final sign-off Nov 2024 | 1914 45th Av | Lemus Construction Inc | remodel of an existing kitchen on the 2nd floor including demolition of existing non-structural interior partition wall; demo and relocation of skylight, new kitchen lyaout, addition of new recessed lighting, new kitchen cabinetry and finishes, and new flooringDetails
remodel of an existing kitchen on the 2nd floor including demolition of existing non-structural interior partition wall; demo and relocation of skylight, new kitchen lyaout, addition of new recessed lighting, new kitchen cabinetry and finishes, and new flooring | $30,000 |
| Sep 19, 2020 | Completed final sign-off Oct 2021 | 1925 Ellis St | Pioneer Contracting Inc. | kitchen remodel: replacement of (e) casework and appliances. work include the enlargement & the dining room by demolition of (e) closets and enlargment of the (e) door portal to create a pocket door.Details
kitchen remodel: replacement of (e) casework and appliances. work include the enlargement & the dining room by demolition of (e) closets and enlargment of the (e) door portal to create a pocket door. | $49,000 |
| Mar 3, 2020 | Completed final sign-off May 2022 | 301 Mission St | J Cruz Builders | unit 57a -remodel unit. proposed renovation includes opening up existing enclosed kitchen and den, including demo of non load bearing parititions and casework. new construction to include revised kitchen casework, finishes, new non load bearing partitoins (walk in pantry) and new pocket doDetails
unit 57a -remodel unit. proposed renovation includes opening up existing enclosed kitchen and den, including demo of non load bearing parititions and casework. new construction to include revised kitchen casework, finishes, new non load bearing partitoins (walk in pantry) and new pocket do | $58,800 |