Andrew George Byrne
- Listed as
- authorized agent-others, contractor
- Firm
- Terence Mcmahon Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2005 to Jul 2026
551 permits since 2000 (contractor on 551 permits, authorized agent-others on 23 permits): 426 completed, 27 in progress, 74 never finaled, 24 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 551.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 31, 2026 | In progress issued Oct 2026 | 118 Collins St | Terence Mcmahon Construction | to obtain final inspection for work approved under pa #202009224738. all work is complete.Details
to obtain final inspection for work approved under pa #202009224738. all work is complete. | |
| Jun 18, 2026 | Completed final sign-off Aug 2026 | 1475 Noe St | Terence Mcmahon Construction | replace in kind 150 sq ft of tile on floor and walls of bathroom. new waterproofing for shower pan.Details
replace in kind 150 sq ft of tile on floor and walls of bathroom. new waterproofing for shower pan. | $12,000 |
| Jun 2, 2026 | In progress issued Jun 2026 | 1631 Beach St | Terence Mcmahon Construction | to comply with physical inspection report cc 8735.Details
to comply with physical inspection report cc 8735. | $6,500 |
| May 22, 2026 | In progress issued May 2026 | 1880 Steiner St | Terence Mcmahon Construction | unit 310: kitchen remodel 85 sq ft, and bathroom remodel, 80 sq ft, guest bathroom 70 sq ft, new ceiling lights throughout home, electrical and plumbing updates as needed.Details
unit 310: kitchen remodel 85 sq ft, and bathroom remodel, 80 sq ft, guest bathroom 70 sq ft, new ceiling lights throughout home, electrical and plumbing updates as needed. | $85,000 |
| May 1, 2026 | In progress filed May 2026, not yet issued | 2140 Great Hy | Terence Mcmahon Construction | abatement of nov #201953441. legalize unpermitted unit as state adu (unit a, 686 sf) at g/f per gvnt sec, 65852.2. convert (e) 1-story sloping to be roof deck per (e) access to open space. no change to bldg. replace 2 windows w. 2 glazed slidingdoors on 2/f. no deferral.Details
abatement of nov #201953441. legalize unpermitted unit as state adu (unit a, 686 sf) at g/f per gvnt sec, 65852.2. convert (e) 1-story sloping to be roof deck per (e) access to open space. no change to bldg. replace 2 windows w. 2 glazed slidingdoors on 2/f. no deferral. | $85,000 |
| Apr 28, 2026 | In progress issued Jun 2026 | 2140 Clement St | Terence Mcmahon Construction | tenant improvement in an (e) second story commissary kitchen restaurant space, non-structural. walls, new equipment modified finishes. new finishes in (e) restroom, minor plumbing, mechanical and electrical. permit only to provide occ to the second floor kitchenDetails
tenant improvement in an (e) second story commissary kitchen restaurant space, non-structural. walls, new equipment modified finishes. new finishes in (e) restroom, minor plumbing, mechanical and electrical. permit only to provide occ to the second floor kitchen | $65,000 |
| Mar 10, 2026 | Completed final sign-off Jun 2026 | 300 Magellan Av | Terence Mcmahon Construction | revision to pa #202602206255. temporary remove bricks to access the framed stair below. replace any dry rot wood or framing in kind. rewaterproof stair, lay existing brick. in same location pattern as existing.Details
revision to pa #202602206255. temporary remove bricks to access the framed stair below. replace any dry rot wood or framing in kind. rewaterproof stair, lay existing brick. in same location pattern as existing. | |
| Mar 10, 2026 | Completed final sign-off Jul 2026 | 151 Broderick St | Terence Mcmahon Construction | 1st flr: kitchen remodel, replace in kind, non structual, no changes to layout, kitchen approx 280 sq ft.Details
1st flr: kitchen remodel, replace in kind, non structual, no changes to layout, kitchen approx 280 sq ft. | $50,000 |
| Mar 10, 2026 | Completed final sign-off Aug 2026 | 531 05th Av | Terence Mcmahon Construction | replace dry rot repair located front and back of property. 240 sq ft. repairs to framing member and sill plate. all framing repaired in kind. all work ground floor.Details
replace dry rot repair located front and back of property. 240 sq ft. repairs to framing member and sill plate. all framing repaired in kind. all work ground floor. | $20,000 |
| Mar 6, 2026 | Completed final sign-off Mar 2026 | 1451 Montgomery St | Terence Mcmahon Construction | unit 4: existing non bearing portion of wall between kitchen and dining room to be removed.Details
unit 4: existing non bearing portion of wall between kitchen and dining room to be removed. | $63,000 |
| Feb 27, 2026 | In progress issued Mar 2026 | 2566 Pine St | Terence Mcmahon Construction | demo and rebuild (e) entry stair from 1st to 2nd fl (interior stair). reframe (e) wall between common vestibule and unit 1 foyer to accomodate (n) pocket doors mis. elec per plansDetails
demo and rebuild (e) entry stair from 1st to 2nd fl (interior stair). reframe (e) wall between common vestibule and unit 1 foyer to accomodate (n) pocket doors mis. elec per plans | $40,000 |
| Feb 20, 2026 | Completed final sign-off Jun 2026 | 300 Magellan Av | Terence Mcmahon Construction | replace in kind brick staircase, demo existing brick to rough framing rewaterproof & reinstall bricks, staircase visible from street, no stuctural work, approx. 200 sq ft, less than 50%Details
replace in kind brick staircase, demo existing brick to rough framing rewaterproof & reinstall bricks, staircase visible from street, no stuctural work, approx. 200 sq ft, less than 50% | $40,000 |
| Feb 4, 2026 | Completed final sign-off Aug 2026 | 531 05th Av | Terence Mcmahon Construction | replace in kind existing siding of front & back of property with james hardie fiber cement lap siding. approx 1200 sqftDetails
replace in kind existing siding of front & back of property with james hardie fiber cement lap siding. approx 1200 sqft | $45,000 |
| Dec 19, 2025 | In progress issued Jan 2026 | 643 02nd Av | Terence Mcmahon Construction | interior remodel of storage spaces at agarage level to create habitable spaces. bracing & bolting upgrade including grade beam. shearwall, anchor bolting, steel channels added to beam and new slab.Details
interior remodel of storage spaces at agarage level to create habitable spaces. bracing & bolting upgrade including grade beam. shearwall, anchor bolting, steel channels added to beam and new slab. | $60,000 |
| Dec 18, 2025 | Completed final sign-off Apr 2026 | 100 09th Av | Terence Mcmahon Construction | replace in kind stucco for full home. street visible approx 2000 sq ft.Details
replace in kind stucco for full home. street visible approx 2000 sq ft. | $55,000 |
| Dec 5, 2025 | In progress issued Dec 2025 | 1350 16th Av | Terence Mcmahon Construction | kitchen remodel. replace in kind. kitchen approx 180 sq ft.Details
kitchen remodel. replace in kind. kitchen approx 180 sq ft. | $32,000 |
| Nov 13, 2025 | Completed final sign-off Nov 2025 | 58 Cook St | Terence Mcmahon Construction | to obtain final insepction for work approved under 202110190729. all work is completeDetails
to obtain final insepction for work approved under 202110190729. all work is complete | |
| Nov 13, 2025 | In progress issued Nov 2025 | 643 02nd Av | Terence Mcmahon Construction | demo (e) lath & plaster in garage & storage room behind garage. re-cover all walls and ceilings with 5/8" type x sheet rock. any other work will be performed under another permit. garage approx. 200 sq ft. storage approx 150 sq ft.Details
demo (e) lath & plaster in garage & storage room behind garage. re-cover all walls and ceilings with 5/8" type x sheet rock. any other work will be performed under another permit. garage approx. 200 sq ft. storage approx 150 sq ft. | $5,000 |
| Nov 12, 2025 | Completed final sign-off Apr 2026 | 100 09th Av | Terence Mcmahon Construction | foundation replacement a dry rot repair of studs @ detached garage. does not encroach into public right of wayDetails
foundation replacement a dry rot repair of studs @ detached garage. does not encroach into public right of way | $20,000 |
| Nov 12, 2025 | In progress issued Nov 2025 | 1451 Montgomery St | Terence Mcmahon Construction | apt 4: kitchen remodel. non-structural work. no change to layout or locations. replace in-kind.Details
apt 4: kitchen remodel. non-structural work. no change to layout or locations. replace in-kind. | $40,000 |
| Nov 12, 2025 | Completed final sign-off Dec 2025 | 45 San Marcos Av | Terence Mcmahon Construction | replace inkind 21 windows, no change to location or rough opening. 18 visible from street. remove from existing window replace with double pane windows.Details
replace inkind 21 windows, no change to location or rough opening. 18 visible from street. remove from existing window replace with double pane windows. | $35,000 |
| Nov 6, 2025 | In progress issued Nov 2025 | 390 27th Av | Terence Mcmahon Construction | revision to pa #20250802671: renovate primary suite including bathroom & walk in closet. renovate main bathroom. replace in kind windows in primary bath, bedroom and main bath.Details
revision to pa #20250802671: renovate primary suite including bathroom & walk in closet. renovate main bathroom. replace in kind windows in primary bath, bedroom and main bath. | $82,000 |
| Oct 30, 2025 | Completed final sign-off Nov 2025 | 20 Hernandez Av | Terence Mcmahon Construction | to obtain final inspection for work approved under pa#202211176759, all work completeDetails
to obtain final inspection for work approved under pa#202211176759, all work complete | |
| Oct 8, 2025 | Completed final sign-off Oct 2025 | 2114 Baker St | Terence Mcmahon Construction | revision to permit#202504245175. replace 3 double hung windows located at front of property. no change to location or rough opening. new windows to be marvin double hung aluminium wood clad, u=.3 max.Details
revision to permit#202504245175. replace 3 double hung windows located at front of property. no change to location or rough opening. new windows to be marvin double hung aluminium wood clad, u=.3 max. | $12,000 |
| Sep 29, 2025 | Completed final sign-off Jan 2026 | 812 35th Av | Terence Mcmahon Construction | kitchen remodel: replace in-kind non-structural, no change to layout. kitchen approx. 125 sq ft.Details
kitchen remodel: replace in-kind non-structural, no change to layout. kitchen approx. 125 sq ft. | $65,000 |
| Sep 23, 2025 | Completed final sign-off Jan 2026 | 2820 Jackson St | Terence Mcmahon Construction | bathroom remodel, replace in kind non-structural, no change to layout, bathroom approx 105 sq ft, like for like.Details
bathroom remodel, replace in kind non-structural, no change to layout, bathroom approx 105 sq ft, like for like. | $75,000 |
| Sep 10, 2025 | Completed final sign-off Oct 2025 | 75 Clipper St | Terence Mcmahon Construction | replace in kind 800 sq ft of siding located on east side of property visible from street.Details
replace in kind 800 sq ft of siding located on east side of property visible from street. | $25,000 |
| Aug 28, 2025 | Completed final sign-off Oct 2025 | 75 Clipper St | Terence Mcmahon Construction | window replacement permit on east side of building not visible from street no change of location or opening. new window to be marvin ultimate aluminum wood clad.Details
window replacement permit on east side of building not visible from street no change of location or opening. new window to be marvin ultimate aluminum wood clad. | $12,000 |
| Aug 28, 2025 | Completed final sign-off May 2026 | 100 09th Av | Terence Mcmahon Construction | replace 25 windows throughout property no change of location or opening. new windows to be marvin ultimate aluminum wood glad.Details
replace 25 windows throughout property no change of location or opening. new windows to be marvin ultimate aluminum wood glad. | $75,000 |
| Aug 15, 2025 | In progress issued Aug 2025 | 235 Marina Bl | Terence Mcmahon Construction | stucco repair (in kind) located at the rear of house. not visible from street. approx 200 sq ftDetails
stucco repair (in kind) located at the rear of house. not visible from street. approx 200 sq ft | $5,500 |
| Aug 15, 2025 | In progress filed Aug 2025, not yet issued | 1139 Lake St | Terence Mcmahon Construction | window replacement permit. replace in kind 8 windows located at rear and side of house. not visible from street. no change of location or opening. new windows will be marvin aluminum wood clad.Details
window replacement permit. replace in kind 8 windows located at rear and side of house. not visible from street. no change of location or opening. new windows will be marvin aluminum wood clad. | $35,000 |
| Aug 8, 2025 | In progress issued Aug 2025 | 390 27th Av | Terence Mcmahon Construction | kitchen remodel in kind on first floor. guest bathroom and master bathroom remodel in kind on second floor. no structural change to layout or framing. kitchen 190 sq ft. guest bathrooom 40 sq ft, master bathroom 80 sq ft.Details
kitchen remodel in kind on first floor. guest bathroom and master bathroom remodel in kind on second floor. no structural change to layout or framing. kitchen 190 sq ft. guest bathrooom 40 sq ft, master bathroom 80 sq ft. | $80,000 |
| Jul 18, 2025 | Completed final sign-off Jan 2026 | 3074 Pacific Av | Terence Mcmahon Construction | remodel (e) kitchen and 1-story expansion into (e) courtyard of (e) 2-story single family dwelling. new fixtures and finishes throughout kitchen. work not visible from public right of wayDetails
remodel (e) kitchen and 1-story expansion into (e) courtyard of (e) 2-story single family dwelling. new fixtures and finishes throughout kitchen. work not visible from public right of way | $25,000 |
| Jul 18, 2025 | Completed final sign-off Jan 2026 | 1407 Cabrillo St | Terence Mcmahon Construction | replace in kind, kitchen, full bath & powder room. non structural no change to layout. bathroom located on 2nd fl approx 100 sq ft. powder room located on first fl approx 25 sqftDetails
replace in kind, kitchen, full bath & powder room. non structural no change to layout. bathroom located on 2nd fl approx 100 sq ft. powder room located on first fl approx 25 sqft | $65,000 |
| Jun 3, 2025 | Completed final sign-off Sep 2025 | 212 Santa Paula Av | Terence Mcmahon Construction | bathroom remodel located on second floor 90 sq ft. replace in kind structual. replace cabinets in kind playroom located on ground floor.Details
bathroom remodel located on second floor 90 sq ft. replace in kind structual. replace cabinets in kind playroom located on ground floor. | $50,000 |
| May 7, 2025 | Completed final sign-off Jun 2025 | 2114 Baker St | Terence Mcmahon Construction | dry rot repair at rear of house at ground level, approx 40 sqft. replace inkind. not visible from street.Details
dry rot repair at rear of house at ground level, approx 40 sqft. replace inkind. not visible from street. | $4,500 |
| May 7, 2025 | Completed final sign-off Jul 2025 | 85 Santa Rita Av | Terence Mcmahon Construction | dry rot repair at south facing wall at side of house approx 80 sqft. reaplce inkind. not visible from street.Details
dry rot repair at south facing wall at side of house approx 80 sqft. reaplce inkind. not visible from street. | $6,000 |
| Apr 24, 2025 | Completed final sign-off Oct 2025 | 2114 Baker St | Terence Mcmahon Construction | replace 6 double hung windows located on 1/f & 2/f. no change to location or rough opening. all visibile from street. new windows to be marvin double hung aluminium wood clad. u=0.3 maxDetails
replace 6 double hung windows located on 1/f & 2/f. no change to location or rough opening. all visibile from street. new windows to be marvin double hung aluminium wood clad. u=0.3 max | $25,000 |
| Apr 23, 2025 | Completed final sign-off Aug 2025 | 1590 Underwood Av | Terence Mcmahon Construction | replace 3 windows out front of property visible from street.no change to location or rough openings.new windows will be marvin aluminum wood clad.Details
replace 3 windows out front of property visible from street.no change to location or rough openings.new windows will be marvin aluminum wood clad. | $20,000 |
| Apr 16, 2025 | Completed final sign-off May 2025 | 185 Edgewood Av | Terence Mcmahon Construction | re waterpoof deck located at top floor bedroom not viisible from the street. replace in kind tile approx. 119 sq ft.Details
re waterpoof deck located at top floor bedroom not viisible from the street. replace in kind tile approx. 119 sq ft. | $17,000 |
| Apr 14, 2025 | In progress issued Apr 2025 | 655 21st Av | Terence Mcmahon Construction | dry rot repair. replace in kind approx. 200 sq ft of dry rot located at rear of house 1st floor. sidingand associated frming. not visible from street.Details
dry rot repair. replace in kind approx. 200 sq ft of dry rot located at rear of house 1st floor. sidingand associated frming. not visible from street. | $15,000 |
| Apr 14, 2025 | In progress issued Apr 2025 | 49 Cumberland St | Terence Mcmahon Construction | exploratory demo permit. demo two 8 ft x 8 ft in section in ceilling. in top floor bedroom and office. in order to inspect roof assembly. any order work will be executed under a seperate permit.Details
exploratory demo permit. demo two 8 ft x 8 ft in section in ceilling. in top floor bedroom and office. in order to inspect roof assembly. any order work will be executed under a seperate permit. | $1,500 |
| Mar 31, 2025 | Completed final sign-off Jul 2025 | 85 Santa Rita Av | Terence Mcmahon Construction | window replacement inkind 17 windows - 3 visible from street. no change in location or size . all (n) windows to be marvin aluminium wood cladDetails
window replacement inkind 17 windows - 3 visible from street. no change in location or size . all (n) windows to be marvin aluminium wood clad | $20,000 |
| Mar 12, 2025 | In progress issued Mar 2025 | 347 05th Av | Terence Mcmahon Construction | to obtain final inspection for work approved under pa#201710100730, 202211237172, 202301170243. all work is completeDetails
to obtain final inspection for work approved under pa#201710100730, 202211237172, 202301170243. all work is complete | |
| Mar 12, 2025 | In progress issued Apr 2025 | 347 05th Av | Terence Mcmahon Construction | to obtain final inspection for work approved under pa#202309227251, 202212218897, 202304065195. all work is completeDetails
to obtain final inspection for work approved under pa#202309227251, 202212218897, 202304065195. all work is complete | |
| Mar 12, 2025 | Completed final sign-off Apr 2025 | 347 05th Av | Terence Mcmahon Construction | to obtain final inspection for work approved under pa#202302141989, 202312182696, 202306069316. all work is completeDetails
to obtain final inspection for work approved under pa#202302141989, 202312182696, 202306069316. all work is complete | |
| Mar 10, 2025 | Completed final sign-off Apr 2025 | 461 Duncan St | Terence Mcmahon Construction | to obtain final inspection for work approved under pa# 201907267095. all work is completeDetails
to obtain final inspection for work approved under pa# 201907267095. all work is complete | |
| Feb 26, 2025 | Completed final sign-off Apr 2025 | 2508 Fillmore St | Terence Mcmahon Construction | dry rot repair on front staircase visible from street. replace in-kind less than 50%.Details
dry rot repair on front staircase visible from street. replace in-kind less than 50%. | $6,000 |
| Feb 26, 2025 | Completed final sign-off Aug 2025 | 164 Lake Merced Hill St South St | Terence Mcmahon Construction | bathroom and powder room remodel, non structural, no change to layout, new tile, plumbing, & electrical upgrades, new vanities, bathroom approx. 60 sq ft, powder room approx. 30 sq ft. no removal of wallsDetails
bathroom and powder room remodel, non structural, no change to layout, new tile, plumbing, & electrical upgrades, new vanities, bathroom approx. 60 sq ft, powder room approx. 30 sq ft. no removal of walls | $35,000 |
| Feb 21, 2025 | Completed final sign-off Apr 2025 | 627 Marina Bl | Terence Mcmahon Construction | replace in-kind tile at deck at rear of house, not visible from street.Details
replace in-kind tile at deck at rear of house, not visible from street. | $3,000 |
| Jan 27, 2025 | Completed final sign-off Feb 2025 | 470 Monticello St | Terence Mcmahon Construction | windows replacment. replae three windows located at front of house and six located at back of property. no change of location or openings to any windows.Details
windows replacment. replae three windows located at front of house and six located at back of property. no change of location or openings to any windows. | $6,000 |
| Nov 27, 2024 | Completed final sign-off Dec 2024 | 2566 Pine St | Terence Mcmahon Construction | to obtain final inspection for work approved under pa# 202208110377. all work is complete.Details
to obtain final inspection for work approved under pa# 202208110377. all work is complete. | |
| Oct 30, 2024 | Completed final sign-off Apr 2025 | 600 Wawona St | Terence Mcmahon Construction | dryrot repair at front legt corner of building. replace in-kind visible from street.Details
dryrot repair at front legt corner of building. replace in-kind visible from street. | $15,000 |
| Oct 30, 2024 | Completed final sign-off Feb 2025 | 2140 Great Hy | Terence Mcmahon Construction | dry rot repair at front of property less than 50%. demo all stucto at the front, replace in-kind with new stucco.Details
dry rot repair at front of property less than 50%. demo all stucto at the front, replace in-kind with new stucco. | $20,000 |
| Oct 23, 2024 | Completed final sign-off Apr 2025 | 600 Wawona St | Terence Mcmahon Construction | demo ceiling & exterior walls on 1st & 2nd floor to inspect framing. framing potentially damaged due to termites. demo drywall only. 4'x4' holes, approx 8 to 9 of themDetails
demo ceiling & exterior walls on 1st & 2nd floor to inspect framing. framing potentially damaged due to termites. demo drywall only. 4'x4' holes, approx 8 to 9 of them | $3,000 |
| Oct 18, 2024 | Completed final sign-off Mar 2025 | 370 De Haro St | Terence Mcmahon Construction | unit 3-replace 2 double hung windows with 2 new double hung windows no change to opening or location replacement is due to wimdow leaking windows are visible from the street. windows are alum wood clad.Details
unit 3-replace 2 double hung windows with 2 new double hung windows no change to opening or location replacement is due to wimdow leaking windows are visible from the street. windows are alum wood clad. | $15,000 |
| Oct 4, 2024 | Completed final sign-off Apr 2025 | 3537 23rd St | Terence Mcmahon Construction | rev 201901079729- 1st floor provide elevator machine room, 2nd and 3rd floor master bathroom reconfigure and laundry room. roof relocate retractable roof hatch.Details
rev 201901079729- 1st floor provide elevator machine room, 2nd and 3rd floor master bathroom reconfigure and laundry room. roof relocate retractable roof hatch. | $1,000 |
| Oct 4, 2024 | Completed final sign-off Jun 2025 | 70 Everson St | Terence Mcmahon Construction | replace existing gas insert fireplace in existing gas insert fireplace location. replace 180 sq ft of stucco at nw corner. 18 linear ft, 1st floor only. replace dryrotted studs and sheathing as needed in kind.Details
replace existing gas insert fireplace in existing gas insert fireplace location. replace 180 sq ft of stucco at nw corner. 18 linear ft, 1st floor only. replace dryrotted studs and sheathing as needed in kind. | $25,000 |
| Sep 19, 2024 | Completed final sign-off Jan 2025 | 4706 25th St | Terence Mcmahon Construction | dry rot repair located at front stair case - less than 50%. repair in kind. replace in kind.Details
dry rot repair located at front stair case - less than 50%. repair in kind. replace in kind. | $10,000 |
| Sep 11, 2024 | Completed final sign-off Jan 2025 | 4706 25th St | Terence Mcmahon Construction | dry rot repair at rear of house less than 50% replacing siding, and door casings in-kind. all work not visible from streetDetails
dry rot repair at rear of house less than 50% replacing siding, and door casings in-kind. all work not visible from street | $15,000 |
| Sep 4, 2024 | Completed final sign-off Jun 2025 | 70 Everson St | Terence Mcmahon Construction | replace in kind cabinets located at bar area on ground floor.Details
replace in kind cabinets located at bar area on ground floor. | $20,000 |
| Aug 26, 2024 | Completed final sign-off Jul 2025 | 3474 Clay St | Terence Mcmahon Construction | bathroom remodel located on top fl. replace in kind approx 130 sq ft. no moving walls. all fixtures to remain in the same location.Details
bathroom remodel located on top fl. replace in kind approx 130 sq ft. no moving walls. all fixtures to remain in the same location. | $25,000 |
| Aug 5, 2024 | In progress issued Aug 2024 | 3474 Clay St | Terence Mcmahon Construction | remove existing sunroom at 4th fl. new rear deck at 4th fl. new outdoor furniture storage for (n) deck. new fixed window at 4th fl at rear wall to match existing.Details
remove existing sunroom at 4th fl. new rear deck at 4th fl. new outdoor furniture storage for (n) deck. new fixed window at 4th fl at rear wall to match existing. | $10,000 |
| Aug 2, 2024 | In progress issued Aug 2024 | 2140 Great Hy | Terence Mcmahon Construction | portion of existing wall to be removed between living room & kitchen 2nd fl. install new beams living room/kitchen areaDetails
portion of existing wall to be removed between living room & kitchen 2nd fl. install new beams living room/kitchen area | $5,000 |
| Jul 31, 2024 | Completed final sign-off Apr 2025 | 2255 Clay St | Terence Mcmahon Construction | interior renovation of 3/f kitchen, laundry and eating spaces. 4/f: to create a new guest bedroom and remodel (e) office area. drop 195 sq.ft of built-up floor framing at 4/f to match height of (e) adj. office area. mep work throughout 4/f interior spaces.Details
interior renovation of 3/f kitchen, laundry and eating spaces. 4/f: to create a new guest bedroom and remodel (e) office area. drop 195 sq.ft of built-up floor framing at 4/f to match height of (e) adj. office area. mep work throughout 4/f interior spaces. | $115,000 |
| Jul 15, 2024 | Completed final sign-off Jan 2025 | 1150 Lombard St | Terence Mcmahon Construction | unit 3-remodel three bathrooms in kind, no change to layout non structural. new plumbing fixtures and fittings and electrical upgrades. new tile on floor and walls , 1 bathroom located on the first floor . 2 bathrooms located the second floor. each bathroom approx. 80 sq ftDetails
unit 3-remodel three bathrooms in kind, no change to layout non structural. new plumbing fixtures and fittings and electrical upgrades. new tile on floor and walls , 1 bathroom located on the first floor . 2 bathrooms located the second floor. each bathroom approx. 80 sq ft | $75,000 |
| Jul 9, 2024 | Completed final sign-off Feb 2025 | 2140 Great Hy | Terence Mcmahon Construction | window replacement at front of house, visible from street, no change to location or size. new window will be a bi fold aluminum clad wood. max u-factor 0.30.Details
window replacement at front of house, visible from street, no change to location or size. new window will be a bi fold aluminum clad wood. max u-factor 0.30. | $30,000 |
| Jun 14, 2024 | Expired or cancelled withdrawn Sep 2024 | 2140 Great Hy | Terence Mcmahon Construction | to comply with nov 201953441. commencement of work not started under previously approved permit pa 8507158Details
to comply with nov 201953441. commencement of work not started under previously approved permit pa 8507158 | $12,000 |
| Jun 5, 2024 | Completed final sign-off Feb 2025 | 2140 Great Hy | Terence Mcmahon Construction | (1) kitchen and (1) bathroom remodel on 1st floor. replace in kind all new fixtures and fittings , electrical and plumbing upgrades. bathroom 80 sqft, kitchen 110 sqft.Details
(1) kitchen and (1) bathroom remodel on 1st floor. replace in kind all new fixtures and fittings , electrical and plumbing upgrades. bathroom 80 sqft, kitchen 110 sqft. | $40,000 |
| Jun 5, 2024 | Completed final sign-off Dec 2024 | 241 Montalvo Av | Terence Mcmahon Construction | two bathroom remodel in kind. no change to layout non structural. new fixtures & fitting plumbing & electrical upgrades. master bath 160 sq ft. guest bathroom 60 sq ftDetails
two bathroom remodel in kind. no change to layout non structural. new fixtures & fitting plumbing & electrical upgrades. master bath 160 sq ft. guest bathroom 60 sq ft | $30,000 |
| Jun 4, 2024 | Completed final sign-off Jun 2024 | 789 02nd Av | Terence Mcmahon Construction | staircase landing dry rot repair located at rear of house on ground floor less than 50% not visible for street work on staircase landingDetails
staircase landing dry rot repair located at rear of house on ground floor less than 50% not visible for street work on staircase landing | $7,000 |
| Jun 4, 2024 | Completed final sign-off Aug 2024 | 352 Lombard St | Terence Mcmahon Construction | replace (e) wood siding with (n) james hardi siding located in light well not visible from street (appx 450sf)Details
replace (e) wood siding with (n) james hardi siding located in light well not visible from street (appx 450sf) | $10,000 |
| Jun 4, 2024 | Completed final sign-off Jan 2025 | 4 Ashbury Tr | Terence Mcmahon Construction | replace in kind siding at rear of house, not visible from street apprx. 1050sf. replace (2) wood windows in the same opening visible from street on 3rd floor, same size, same location, max u-factor 0.30. casement alum wood cladDetails
replace in kind siding at rear of house, not visible from street apprx. 1050sf. replace (2) wood windows in the same opening visible from street on 3rd floor, same size, same location, max u-factor 0.30. casement alum wood clad | $4,700 |
| May 3, 2024 | Completed final sign-off Oct 2024 | 627 Marina Bl | Terence Mcmahon Construction | master bath room remodel located on 2nd fl. no change to layout non structural, new bathtub new marbel floors and walls, new fixtures and fittings approx 90 sq ft.Details
master bath room remodel located on 2nd fl. no change to layout non structural, new bathtub new marbel floors and walls, new fixtures and fittings approx 90 sq ft. | $35,000 |
| May 1, 2024 | Completed final sign-off May 2024 | 154 Pope St | Terence Mcmahon Construction | fix small wall located at front exterior stairs. replace in kindDetails
fix small wall located at front exterior stairs. replace in kind | $5,000 |
| Apr 30, 2024 | Completed final sign-off Aug 2024 | 352 Lombard St | Terence Mcmahon Construction | window replacement in lightwell in kind. no change to location or opening. not visible from street. max u factor 0.30.Details
window replacement in lightwell in kind. no change to location or opening. not visible from street. max u factor 0.30. | $8,000 |
| Apr 24, 2024 | In progress issued Apr 2024 | 2396 27th Av | Terence Mcmahon Construction | to comply with nov# 202422358 items # 1-10: item #2 repair weatherproofing at windows. items #3 repair skylight hardweare, item #4 reinstall door, item #5 repair damaged walls and ceilings, item #6 repair damaged walls, item #7 repair damaged walls, item #8 repair finish, item #9 repair floor coveriDetails
to comply with nov# 202422358 items # 1-10: item #2 repair weatherproofing at windows. items #3 repair skylight hardweare, item #4 reinstall door, item #5 repair damaged walls and ceilings, item #6 repair damaged walls, item #7 repair damaged walls, item #8 repair finish, item #9 repair floor coveri | $5,000 |
| Apr 18, 2024 | In progress issued Apr 2024 | 1133 19th St | Terence Mcmahon Construction | demo stucco around every window (20 windows) to inspect waterproofing & window installation. all windows are leaking. replace stucco in kind. no window replacement under this permit.Details
demo stucco around every window (20 windows) to inspect waterproofing & window installation. all windows are leaking. replace stucco in kind. no window replacement under this permit. | $10,000 |
| Apr 15, 2024 | Completed final sign-off May 2024 | 3009 Sacramento St | Terence Mcmahon Construction | replace in kind 3 non operable skylights at cariage house located at rear of building. not visible from the street. u<=0.30Details
replace in kind 3 non operable skylights at cariage house located at rear of building. not visible from the street. u<=0.30 | $20,000 |
| Apr 12, 2024 | Completed final sign-off Jun 2024 | 1710 48th Av | Terence Mcmahon Construction | kitchen remodel: replace cabinets, new fixtures, and fitting. new countertops. no change to layout. non structural.Details
kitchen remodel: replace cabinets, new fixtures, and fitting. new countertops. no change to layout. non structural. | $25,000 |
| Apr 12, 2024 | Completed final sign-off Nov 2024 | 30 Liberty St | Terence Mcmahon Construction | kitchen and bathroom remodel. non structural. in each unit. total 6 kitchens and 6 bathrooms. in kindDetails
kitchen and bathroom remodel. non structural. in each unit. total 6 kitchens and 6 bathrooms. in kind | $75,000 |
| Apr 12, 2024 | Completed final sign-off Jul 2025 | 3474 Clay St | Terence Mcmahon Construction | powder room remodel no change to layout. located at 1st fl bathroom remodel no change to layout located on groiund floor- laundry remodel no change to layout located ground floor. all non structural. replace two winodws in kind at rear of house not visible from street.Details
powder room remodel no change to layout. located at 1st fl bathroom remodel no change to layout located on groiund floor- laundry remodel no change to layout located ground floor. all non structural. replace two winodws in kind at rear of house not visible from street. | $50,000 |
| Apr 5, 2024 | Completed final sign-off Jul 2024 | 2300 Leavenworth St | Terence Mcmahon Construction | rev to pa# 2024-0329-8943; replace in kind 9 windows, no change to opening or location, visible from the street. windows are leaking need replacementDetails
rev to pa# 2024-0329-8943; replace in kind 9 windows, no change to opening or location, visible from the street. windows are leaking need replacement | $40,000 |
| Apr 2, 2024 | In progress filed Apr 2024, not yet issued | 3115 Clement St | Terence Mcmahon Construction | comply with abe program abe# 202209204583. request for unreasonable hardship. install new doorbell & door handle & power door operatorDetails
comply with abe program abe# 202209204583. request for unreasonable hardship. install new doorbell & door handle & power door operator | $6,450 |
| Apr 1, 2024 | Completed final sign-off Apr 2025 | 463 Duncan St | Terence Mcmahon Construction | repair tile staircase in kind at front of the house- replace in kindDetails
repair tile staircase in kind at front of the house- replace in kind | $4,000 |
| Mar 29, 2024 | Completed final sign-off May 2024 | 1538 48th Av | Terence Mcmahon Construction | replace 4 windows at front of building with aluminum clad marvin. no change to openings or location. visible from street.Details
replace 4 windows at front of building with aluminum clad marvin. no change to openings or location. visible from street. | $25,000 |
| Mar 29, 2024 | Completed final sign-off Jul 2024 | 2300 Leavenworth St | Terence Mcmahon Construction | take out and rewaterproof on east side of building, break stucco around windows and patch back. visible from lombard st. (4windows)Details
take out and rewaterproof on east side of building, break stucco around windows and patch back. visible from lombard st. (4windows) | $15,000 |
| Mar 25, 2024 | In progress issued Apr 2024 | 164 Lake Merced Hill St South St | Terence Mcmahon Construction | interior only non structural remodel at 1st level only. addition of home office/gym, bathroom and patio furniture storage area. new interior doors, fixtures, finishes, venting. relocation of washer dryer, new window replacement at rear. no work at front facade. no work in prow.Details
interior only non structural remodel at 1st level only. addition of home office/gym, bathroom and patio furniture storage area. new interior doors, fixtures, finishes, venting. relocation of washer dryer, new window replacement at rear. no work at front facade. no work in prow. | $20,000 |
| Mar 1, 2024 | In progress issued Mar 2024 | 234 Eureka St | Terence Mcmahon Construction | revision to pa #202401164044 additional repairs to front stairs inkind. include structural doubling up ledgerbeam connected at (e) garage ceiling. replace 1 rail post to bldg.Details
revision to pa #202401164044 additional repairs to front stairs inkind. include structural doubling up ledgerbeam connected at (e) garage ceiling. replace 1 rail post to bldg. | $5,000 |
| Feb 27, 2024 | In progress filed Feb 2024, not yet issued | 2200 Lyon St | Terence Mcmahon Construction | revision to pa# 202107295402- revision to clarify the building is existing 4 stories with no habitable space at the ground floor.Details
revision to pa# 202107295402- revision to clarify the building is existing 4 stories with no habitable space at the ground floor. | |
| Feb 20, 2024 | Completed final sign-off Jul 2024 | 1150 Lombard St | Terence Mcmahon Construction | unit #3: replace old kitchen cabinets with new cabinets, new flooring in kitchen area only. new plumbing fixtures, new stone tops, new gile back splash and new range and hood. non structural.Details
unit #3: replace old kitchen cabinets with new cabinets, new flooring in kitchen area only. new plumbing fixtures, new stone tops, new gile back splash and new range and hood. non structural. | $35,000 |
| Feb 15, 2024 | Completed final sign-off Oct 2024 | 111 Chestnut St | Terence Mcmahon Construction | unit #605: kitchen and 2 bathrooms remodel. plumbing and electrical upgrades. all new fixtures and fittings.Details
unit #605: kitchen and 2 bathrooms remodel. plumbing and electrical upgrades. all new fixtures and fittings. | $150,000 |
| Feb 5, 2024 | Completed final sign-off Jan 2025 | 4 Ashbury Tr | Terence Mcmahon Construction | replace in kind 12 existing windows. 2 of which are visible from the street on the second level. no change to window openings. no structural work.m-factor=.30 maxDetails
replace in kind 12 existing windows. 2 of which are visible from the street on the second level. no change to window openings. no structural work.m-factor=.30 max | $30,000 |
| Jan 24, 2024 | Completed final sign-off Apr 2024 | 1065 Sutter St | Terence Mcmahon Construction | replace in kind door located on rooftop penhouse. install new frame and hardware. not visible from streetDetails
replace in kind door located on rooftop penhouse. install new frame and hardware. not visible from street | $6,000 |
| Jan 16, 2024 | Completed final sign-off May 2024 | 234 Eureka St | Terence Mcmahon Construction | dry rot repair on front staircase, less than 50%Details
dry rot repair on front staircase, less than 50% | $6,000 |
| Dec 14, 2023 | Completed final sign-off Jan 2024 | 627 Marina Bl | Terence Mcmahon Construction | due to leak on top floor, we need to take off drywall on first floor and basement at affected areas (bedroom ceiling and wall, and garage back wall), replace insulation and drywall in kind. no new wallsDetails
due to leak on top floor, we need to take off drywall on first floor and basement at affected areas (bedroom ceiling and wall, and garage back wall), replace insulation and drywall in kind. no new walls | $10,000 |
| Dec 7, 2023 | Completed final sign-off Apr 2025 | 463 Duncan St | Terence Mcmahon Construction | add counter-top casework "appliance garage" @ kitchen cabinets, install buffet @ dining room and at fireplaceDetails
add counter-top casework "appliance garage" @ kitchen cabinets, install buffet @ dining room and at fireplace | $25,000 |
| Dec 4, 2023 | Completed final sign-off May 2024 | 1023 Oak St | Terence Mcmahon Construction | replace in kind dry rot at landing and stair area at rear of house, not visible from street. less than 50%-ground floor onlyDetails
replace in kind dry rot at landing and stair area at rear of house, not visible from street. less than 50%-ground floor only | $4,000 |
| Dec 4, 2023 | Completed final sign-off Mar 2024 | 385 Castenada Av | Terence Mcmahon Construction | legalize bathroom located at basement levelDetails
legalize bathroom located at basement level | $35,000 |
| Nov 29, 2023 | Completed final sign-off Apr 2024 | 3990 Washington St | Terence Mcmahon Construction | replace in kind stucco on the deck. approx 120 sq ft. demoed stucco on walls surrounding deck in order to waterproof.Details
replace in kind stucco on the deck. approx 120 sq ft. demoed stucco on walls surrounding deck in order to waterproof. | $5,000 |