Andre Gregorio
- Listed as
- architect, engineer
- Firm
- Axion
- On San Francisco permits
- May 2019 to Feb 2022
4 permits since 2000 (engineer on 3 permits, architect on 1 permit): 1 completed, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 16, 2022 | Completed final sign-off Oct 2023 | 2675 Geary Bl | Rod Heisler Construction | 1-story horizontal addition -space e-100: raw shell improvement. addtion of 480sf to tenant space. addition to (n) storage front system. addition of 3 landscaope planters. removal of (e) asphalt paving with new concrete paving for the addition of 5 standard parking stalls.Details
1-story horizontal addition -space e-100: raw shell improvement. addtion of 480sf to tenant space. addition to (n) storage front system. addition of 3 landscaope planters. removal of (e) asphalt paving with new concrete paving for the addition of 5 standard parking stalls. | $125,000 |
| Feb 16, 2022 | Expired or cancelled cancelled Jan 2026 | 555 09th St | remove (e) steel window awnings. remove (e) exterior wall plaster treatment. removeal of (e) exterior steel ornamentation cages. installation of new steel canopies. paint entire exterior. ada improvements.Details
remove (e) steel window awnings. remove (e) exterior wall plaster treatment. removeal of (e) exterior steel ornamentation cages. installation of new steel canopies. paint entire exterior. ada improvements. | $360,000 | |
| May 22, 2019 | Never finaled issued Sep 2019, no final | 1661 Mission St | Weller Construction Inc. | 1/fl. document change of use from office to health service. non-oshpd ti. new walls, ceilings, and finishes, new mechanical, electrical, plumbing and structural. no changes to exterior, sprinklers deffered submittal. comply w/planning enf case no. 2019-013799enf.Details
1/fl. document change of use from office to health service. non-oshpd ti. new walls, ceilings, and finishes, new mechanical, electrical, plumbing and structural. no changes to exterior, sprinklers deffered submittal. comply w/planning enf case no. 2019-013799enf. | $1,700,000 |
| May 9, 2019 | Never finaled issued May 2019, no final | 1661 Mission St | Weller Construction Inc. | ground fl: non-structural interior demolition per ab-017 - includes non-bearing partitions, electrical outlets/switches/lights and mechanical ducts.Details
ground fl: non-structural interior demolition per ab-017 - includes non-bearing partitions, electrical outlets/switches/lights and mechanical ducts. | $38,000 |