Alojz Ostrak
- Listed as
- engineer
- On San Francisco permits
- Jun 2020 to Nov 2020
2 permits since 2000 (engineer on 2 permits): 2 completed.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 24, 2020 | Completed final sign-off Nov 2022 | 612 Howard St | J..H. Construction Co./John A Huerta Co | lobby: remove and replace floor finishes. replace (e) lighting and add (n) lighting. replace (e) door at suite 100. (n) wall finishes, paint throughout.Details
lobby: remove and replace floor finishes. replace (e) lighting and add (n) lighting. replace (e) door at suite 100. (n) wall finishes, paint throughout. | $18,000 |
| Jun 30, 2020 | Completed final sign-off Nov 2021 | 612 Howard St | J..H. Construction Co./John A Huerta Co | ti (n) toilets, (n) fixtures & (n) finishes, (n) lighting @ (e) j boxes. sand & patch (e) wood floorDetails
ti (n) toilets, (n) fixtures & (n) finishes, (n) lighting @ (e) j boxes. sand & patch (e) wood floor | $195,000 |