- Dec 2007 to Aug 2026
208 permits since 2000 (contractor on 208 permits, authorized agent-others on 1 permit): 161 completed, 19 in progress, 9 never finaled, 19 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 208.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 28, 2026 | In progress issued Aug 2026 | 711 Marina Bl | Citidev Inc. | remodel kitchen with cabinets, counters, tile, appliances and plumbing fixtures in kind.Details
remodel kitchen with cabinets, counters, tile, appliances and plumbing fixtures in kind. | $125,000 |
| Aug 7, 2026 | In progress issued Aug 2026 | 212 States St | Citidev Inc. | replace existing decomposed foundation at existiing bathroom. no change to layout. no change to use. no exterior work.Details
replace existing decomposed foundation at existiing bathroom. no change to layout. no change to use. no exterior work. | $30,000 |
| Jul 8, 2026 | In progress issued Jul 2026 | 1896 Pacific Av | Citidev Inc. | repair (e) solarium overhead glass. retain (e) roof & solarium structure. repair (e) exterior door ar rec. room. remove (e) tile and topping slab at terrace, retain (e) structural slab.install (n) insulation. waterproofing, drainage & pavers ib pedestal system, tie to drainage system.Details
repair (e) solarium overhead glass. retain (e) roof & solarium structure. repair (e) exterior door ar rec. room. remove (e) tile and topping slab at terrace, retain (e) structural slab.install (n) insulation. waterproofing, drainage & pavers ib pedestal system, tie to drainage system. | $50,000 |
| Jul 8, 2026 | In progress issued Aug 2026 | 2615 Divisadero St | Citidev Inc. | revision to bpa: 202508263895 - replace steel beam at facade of property and replace (e) concrete pilaster and steel post supporting (e) beam. new beam to be supported by steel colmn embedded in drilled pier foundation in place of (e) steel post.Details
revision to bpa: 202508263895 - replace steel beam at facade of property and replace (e) concrete pilaster and steel post supporting (e) beam. new beam to be supported by steel colmn embedded in drilled pier foundation in place of (e) steel post. | $15,000 |
| Jun 23, 2026 | In progress issued Jun 2026 | 3352 Market St | Citidev Inc. | revision to 202512161885 adding a grade beam below a shear wall on the existing structural plan. engineer assumed e foundation adequate for support but not deep enough. plumbingb fixtures in e downstiars bath are directly on ltop of new grade beam location so had to remove for access and reinstallDetails
revision to 202512161885 adding a grade beam below a shear wall on the existing structural plan. engineer assumed e foundation adequate for support but not deep enough. plumbingb fixtures in e downstiars bath are directly on ltop of new grade beam location so had to remove for access and reinstall | $25,000 |
| Jun 15, 2026 | In progress issued Jun 2026 | 212 States St | Citidev Inc. | bathroom remodel: remove and replace plumbing fixtures, in-kind. tub converted to shower. no removal of any walls.Details
bathroom remodel: remove and replace plumbing fixtures, in-kind. tub converted to shower. no removal of any walls. | $30,000 |
| May 26, 2026 | Completed final sign-off Jun 2026 | 196 Liberty St | Citidev Inc. | to obtain final inspection for work approved under 202407166590 and 202503252971. all work is completeDetails
to obtain final inspection for work approved under 202407166590 and 202503252971. all work is complete | |
| May 18, 2026 | In progress filed May 2026, not yet issued | 28 Day St | Citidev Inc. | revision to permit 202502240915-s1 to remove basement. remove laundry in common area.Details
revision to permit 202502240915-s1 to remove basement. remove laundry in common area. | |
| May 7, 2026 | Completed final sign-off Aug 2026 | 130 Amber Dr | Citidev Inc. | remodel bathroom, replace fixtures in kind, no removal on walls. replace 1 window back of bldg, non street facing.Details
remodel bathroom, replace fixtures in kind, no removal on walls. replace 1 window back of bldg, non street facing. | $50,000 |
| May 5, 2026 | In progress issued May 2026 | 1558 15th St | Citidev Inc. | change of use approved under 202512161870. t.i. improvements include soft demo, mezzanine structure, partitions, accessible features, and restrooms, elect and lights. mechanial deferred.Details
change of use approved under 202512161870. t.i. improvements include soft demo, mezzanine structure, partitions, accessible features, and restrooms, elect and lights. mechanial deferred. | $460,000 |
| Apr 17, 2026 | In progress issued Apr 2026 | 18 Roosevelt Wy | Citidev Inc. | reroofing: tpo roof. no hot works. reference roof deck permit pa# 202604179626.Details
reroofing: tpo roof. no hot works. reference roof deck permit pa# 202604179626. | $40,000 |
| Apr 17, 2026 | In progress issued Apr 2026 | 18 Roosevelt Wy | Citidev Inc. | disassemble and reassemble roof deck. leave existing anchoring for deck. reuse (e) pt framing and wood pavers. bring (e) guardrail into compliance. replace in-kind. reference re-roofing permit pa#202604179629.Details
disassemble and reassemble roof deck. leave existing anchoring for deck. reuse (e) pt framing and wood pavers. bring (e) guardrail into compliance. replace in-kind. reference re-roofing permit pa#202604179629. | $20,000 |
| Mar 16, 2026 | In progress issued Mar 2026 | 1558 15th St | Citidev Inc. | soft demo only. no structural work. tenant improvement to be filed under separate permit.Details
soft demo only. no structural work. tenant improvement to be filed under separate permit. | $10,000 |
| Dec 16, 2025 | In progress issued Feb 2026 | 3352 Market St | Citidev Inc. | interior renovation and small rear addition totaling 32 sq ft. this work includes new finishes, fixtures, casework, lighting, plumbing, and electircal at the kitchen, bath #1 and bath #2. will required electrical panel upgrade and full remodel of knob and tube. new siding at the facade attached to..Details
interior renovation and small rear addition totaling 32 sq ft. this work includes new finishes, fixtures, casework, lighting, plumbing, and electircal at the kitchen, bath #1 and bath #2. will required electrical panel upgrade and full remodel of knob and tube. new siding at the facade attached to.. | $650,000 |
| Dec 16, 2025 | In progress issued Feb 2026 | 1558 15th St | Citidev Inc. | proposed changed of use from industrial (f-1) to retail (m) use. install powered door operator to comply w/ sfobi da-04. no other work.Details
proposed changed of use from industrial (f-1) to retail (m) use. install powered door operator to comply w/ sfobi da-04. no other work. | $5,000 |
| Nov 14, 2025 | Completed final sign-off May 2026 | 1570 Sanchez St | Citidev Inc. | revision to 202508042195. replacement of ext stair at front to be in kind replacement< non conforming riser ht to remain at rear yard, modify new fence framing in lieu of guardrailDetails
revision to 202508042195. replacement of ext stair at front to be in kind replacement< non conforming riser ht to remain at rear yard, modify new fence framing in lieu of guardrail | |
| Sep 29, 2025 | Completed final sign-off Dec 2025 | 130 Amber Dr | Citidev Inc. | remodel of bathroom, replace fixtures in-kind. no removal of wallsDetails
remodel of bathroom, replace fixtures in-kind. no removal of walls | $20,000 |
| Sep 29, 2025 | Completed final sign-off Feb 2026 | 3649 21st St | Citidev Inc. | remodel of (e) kitchen. all fixtures to be replaced in-kind. no removal of wallsDetails
remodel of (e) kitchen. all fixtures to be replaced in-kind. no removal of walls | $35,000 |
| Sep 5, 2025 | Completed final sign-off Jun 2026 | 196 Liberty St | Citidev Inc. | (n) soldier pile (retaining) wall at rear yard. existing wall to remain.Details
(n) soldier pile (retaining) wall at rear yard. existing wall to remain. | $15,000 |
| Aug 26, 2025 | In progress issued Nov 2025 | 2615 Divisadero St | Citidev Inc. | exterior alterations to exterior side stair & garage door within property line, installation of new trench drain at new face of garage door.Details
exterior alterations to exterior side stair & garage door within property line, installation of new trench drain at new face of garage door. | $125,000 |
| Aug 4, 2025 | Completed final sign-off May 2026 | 1570 Sanchez St | Citidev Inc. | replace exterior front stairs. replace deck, fence and guardrail at rear yead. replace exterior doors and windows at rear yard. remove property line window and in-fill opening.Details
replace exterior front stairs. replace deck, fence and guardrail at rear yead. replace exterior doors and windows at rear yard. remove property line window and in-fill opening. | $25,000 |
| Jun 10, 2025 | In progress issued Jun 2025 | 829 Rhode Island St | Citidev Inc. | remodel shower at ground floor bathroom, including floor + wall tiles. rev pa 202411215512.Details
remodel shower at ground floor bathroom, including floor + wall tiles. rev pa 202411215512. | $7,500 |
| May 29, 2025 | Completed final sign-off Jun 2026 | 196 Liberty St | Citidev Inc. | rev pa202407166590-s1 & pa# 202503252971 for revisied structural design and details.Details
rev pa202407166590-s1 & pa# 202503252971 for revisied structural design and details. | |
| Apr 16, 2025 | Completed final sign-off Feb 2026 | 3649 21st St | Hamerkop Construction Inc, Citidev Inc. | like to like replace 2 windows and 1 door at the back of the house. fiberglass door and windows replace w-proof around win. & dr, rep. stcco around win. and dr, paint ext & int wall where win. and dr are located. rep. back deck roof memb. in kind. cbc 107.2.5, 110.3.7.Details
like to like replace 2 windows and 1 door at the back of the house. fiberglass door and windows replace w-proof around win. & dr, rep. stcco around win. and dr, paint ext & int wall where win. and dr are located. rep. back deck roof memb. in kind. cbc 107.2.5, 110.3.7. | $50,555 |
| Mar 25, 2025 | Expired or cancelled expired Jun 2026 | 196 Liberty St | Citidev Inc. | revision to 2024-0716-6590 s1 and s2; revision consists of changing the layout of unit 2 entry off dolores street; addressing additional concrete work per site conditionsDetails
revision to 2024-0716-6590 s1 and s2; revision consists of changing the layout of unit 2 entry off dolores street; addressing additional concrete work per site conditions | |
| Mar 6, 2025 | In progress issued Oct 2025 | 28 Day St | Citidev Inc. | alteration/addition of existing 3-story, 2-unit (2-units + 1-unauthorized dwelling unit) residential building, resulting in a 4-story, 3-units residential building of upgraded units.Details
alteration/addition of existing 3-story, 2-unit (2-units + 1-unauthorized dwelling unit) residential building, resulting in a 4-story, 3-units residential building of upgraded units. | $4,750,000 |
| Mar 3, 2025 | Completed final sign-off Nov 2025 | 3240 Sacramento St | Citidev Inc. | remodel of 2 bathrooms, replace all fixtures in kind. bathroom 1 has toilet, tub & single vanity. bathroom 2 has toilet, shower and double vanity. no wall removal other than partition in bathroom 1 (between w.c. and lavatory)Details
remodel of 2 bathrooms, replace all fixtures in kind. bathroom 1 has toilet, tub & single vanity. bathroom 2 has toilet, shower and double vanity. no wall removal other than partition in bathroom 1 (between w.c. and lavatory) | $75,000 |
| Mar 3, 2025 | In progress issued Mar 2025 | 212 States St | Citidev Inc. | replace (e) painted cedar shingles with new wood cedar shingles. street visible.Details
replace (e) painted cedar shingles with new wood cedar shingles. street visible. | $42,000 |
| Feb 13, 2025 | Completed final sign-off May 2025 | 88 South Park | Citidev Inc. | replace insulation and drywall in dining room and bedroom that was damaged due to water from the sprinkler system, repair damaged electrical elements, no plumbing work proposed.Details
replace insulation and drywall in dining room and bedroom that was damaged due to water from the sprinkler system, repair damaged electrical elements, no plumbing work proposed. | $40,000 |
| Jan 2, 2025 | Completed final sign-off Oct 2025 | 3607 Folsom St | Citidev Inc. | replace kitchen cabinets in kind, new countertops, backsplash, appliances. replace bathroom fixtures in kind, new tile.Details
replace kitchen cabinets in kind, new countertops, backsplash, appliances. replace bathroom fixtures in kind, new tile. | $75,000 |
| Dec 10, 2024 | Completed final sign-off Jan 2025 | 3668 24th St | Citidev Inc. | fix framing siding and chipped foundation cap that all cover nov #20431553 garage area on front of building. repair all damage in kind.Details
fix framing siding and chipped foundation cap that all cover nov #20431553 garage area on front of building. repair all damage in kind. | $10,000 |
| Nov 21, 2024 | Completed final sign-off Jul 2025 | 829 Rhode Island St | Citidev Inc. | install 3 new light fixtures in entrance and 2 bedrooms. replace front door in-kind. interior paiting in 2 bedrooms and 1 living room.Details
install 3 new light fixtures in entrance and 2 bedrooms. replace front door in-kind. interior paiting in 2 bedrooms and 1 living room. | $20,000 |
| Nov 12, 2024 | Completed final sign-off Nov 2025 | 71 Jordan Av | Citidev Inc. | widen (e) driveway alter one (e) remaining wall and replace one (e) retaining wall with new wall. motified curb cutDetails
widen (e) driveway alter one (e) remaining wall and replace one (e) retaining wall with new wall. motified curb cut | $12,000 |
| Sep 20, 2024 | Completed final sign-off Oct 2024 | 1960 15th St | Citidev Inc. | existing rear stair repair, less than 50%. all work to be done in kind at exterior rear stair.Details
existing rear stair repair, less than 50%. all work to be done in kind at exterior rear stair. | $4,000 |
| Sep 16, 2024 | Completed final sign-off Jan 2025 | 2929 Broderick St | Citidev Inc. | voluntary structural reinforcement/repair at rear stair with new concrete footing and plywood sheathing (no work on stairs)Details
voluntary structural reinforcement/repair at rear stair with new concrete footing and plywood sheathing (no work on stairs) | $22,000 |
| Jul 31, 2024 | Completed final sign-off Aug 2024 | 3607 Folsom St | Citidev Inc. | repair of (e) rear back stairs to deck, not to exceed 50%Details
repair of (e) rear back stairs to deck, not to exceed 50% | $5,900 |
| Jul 31, 2024 | In progress issued Jul 2024 | 755 El Camino Del Mar | Citidev Inc. | install 6 new recessed cans at media room, new ceiling fixture and new fireplace (gas, direct vent) insert and surround at living room, drywall patching and taping as needed after electrical work. no exterior work.Details
install 6 new recessed cans at media room, new ceiling fixture and new fireplace (gas, direct vent) insert and surround at living room, drywall patching and taping as needed after electrical work. no exterior work. | $45,000 |
| Jul 25, 2024 | Expired or cancelled expired Jun 2026 | 196 Liberty St | Citidev Inc. | alter site permit. revision to pa # 202302162120: previously proposed rear deck has been removed and new wood steps and landing to rear yard is proposed in the revised set.Details
alter site permit. revision to pa # 202302162120: previously proposed rear deck has been removed and new wood steps and landing to rear yard is proposed in the revised set. | $50,000 |
| Apr 12, 2024 | Completed final sign-off Apr 2024 | 2442 Great Hy | Citidev Inc. | revision to pa#202201186097. planned removal of extg stair skylight. removed from slope.Details
revision to pa#202201186097. planned removal of extg stair skylight. removed from slope. | |
| Mar 22, 2024 | Completed final sign-off Oct 2025 | 71 Jordan Av | Citidev Inc. | (n) kitchen pantry, fireplace stone; (n) millwork for fireplace, powder, laundry, primary bath. painting of kitchen cabinets; (n) front door, new gas firepit in backyard replace in kind. millwork for front living room and family lounge; new wine fridge in basement, new light pendants in kitchen, newDetails
(n) kitchen pantry, fireplace stone; (n) millwork for fireplace, powder, laundry, primary bath. painting of kitchen cabinets; (n) front door, new gas firepit in backyard replace in kind. millwork for front living room and family lounge; new wine fridge in basement, new light pendants in kitchen, new | $250,000 |
| Feb 13, 2024 | Completed final sign-off May 2024 | 2785 Jackson St | Citidev Inc. | unit 5: bathroom 1: replace vanity, shower tile and fixtures in kind. bathroom 2: replace vanity, toilet and plumbing fixtures in kind.Details
unit 5: bathroom 1: replace vanity, shower tile and fixtures in kind. bathroom 2: replace vanity, toilet and plumbing fixtures in kind. | $30,000 |
| Jan 25, 2024 | Completed final sign-off Jan 2025 | 3240 Sacramento St | Citidev Inc. | demo (e) kitchen cabinets, countertops, appliances, drywall and replace in kind. (n) can lights @ kitchen and bfreakfast room. (n) h.w. floor @ kitchen, hallway, living and media room. replace (e) toilet @ powder room, (n) gas line for insert @ livingroom.Details
demo (e) kitchen cabinets, countertops, appliances, drywall and replace in kind. (n) can lights @ kitchen and bfreakfast room. (n) h.w. floor @ kitchen, hallway, living and media room. replace (e) toilet @ powder room, (n) gas line for insert @ livingroom. | $310,000 |
| Nov 16, 2023 | Completed final sign-off Aug 2024 | 876 Castro St | Citidev Inc. | revision to approved pa 2023-0810-4121. at garage building. new architectural projection (canopy) above exterior entry door @ sidewalk; widen previously approved canopy above elevator door. all work @ common area garageDetails
revision to approved pa 2023-0810-4121. at garage building. new architectural projection (canopy) above exterior entry door @ sidewalk; widen previously approved canopy above elevator door. all work @ common area garage | $5,000 |
| Oct 11, 2023 | Completed final sign-off Sep 2024 | 168 Jersey St | Citidev Inc. | the scope of work generally consists of the replacement of exterior finishes and front facade windows.Details
the scope of work generally consists of the replacement of exterior finishes and front facade windows. | $150,000 |
| Aug 10, 2023 | Completed final sign-off Aug 2024 | 876 Castro St | Citidev Inc. | garage building: replace ext entry gate w/new aluminium/glass door, interior doors in-kind, new architectural projection (canopy) above ext elevator door opening, remove (e) decotrative canopy in roof cornice above entryDetails
garage building: replace ext entry gate w/new aluminium/glass door, interior doors in-kind, new architectural projection (canopy) above ext elevator door opening, remove (e) decotrative canopy in roof cornice above entry | $7,000 |
| Aug 10, 2023 | Completed final sign-off May 2024 | 471 14th Av | Citidev Inc. | revision to pa202201286902. replace previously permitted exterior steel stair and landing with wood stair & landing. relocate exterior door and window to suit-modifications to previously permited structual specifications. no other work.Details
revision to pa202201286902. replace previously permitted exterior steel stair and landing with wood stair & landing. relocate exterior door and window to suit-modifications to previously permited structual specifications. no other work. | $1,000 |
| Jul 25, 2023 | Completed final sign-off Apr 2024 | 2442 Great Hy | Citidev Inc. | the scope of work consists of interior alteration to an existing g/l garage and includes the follwoing: addition of 2 storage enclosures.Details
the scope of work consists of interior alteration to an existing g/l garage and includes the follwoing: addition of 2 storage enclosures. | $15,000 |
| Feb 16, 2023 | Completed final sign-off Jun 2026 | 196 Liberty St | Citidev Inc. | demolish int walls, new int wall layouts, increase size of garage door, new landscaping and repair (e) retaining walls in back yard, replace (e) stair in backyard. new ground floor second unitDetails
demolish int walls, new int wall layouts, increase size of garage door, new landscaping and repair (e) retaining walls in back yard, replace (e) stair in backyard. new ground floor second unit | $1,000,000 |
| Nov 4, 2022 | Expired or cancelled cancelled Jan 2026 | 2442 Great Hy | Citidev Inc. | revision to permit 202201186097. new beams at roof level for future permit. update of front facade beams at 2/f and 3/f to coordinate with architectural detailing.Details
revision to permit 202201186097. new beams at roof level for future permit. update of front facade beams at 2/f and 3/f to coordinate with architectural detailing. | $2,000 |
| Oct 25, 2022 | Completed final sign-off Apr 2024 | 653 Duncan St | Citidev Inc. | interior kitchen, bath remodel at floor 1,2 3. exterior windows, guardrail, entry gate throughoutDetails
interior kitchen, bath remodel at floor 1,2 3. exterior windows, guardrail, entry gate throughout | $250,000 |
| Oct 18, 2022 | In progress issued Jan 2024 | 2442 Great Hy | Citidev Inc. | addition of a new penthouse stair & private roof deck @ unit #3 to an existing 3 story 4 unit apartment.Details
addition of a new penthouse stair & private roof deck @ unit #3 to an existing 3 story 4 unit apartment. | $100,000 |
| Apr 22, 2022 | Completed final sign-off Dec 2023 | 3875 Clay St | Citidev Inc. | replace extg double hung wood sachs at front and sides with new wood sash, bathroom window glass to be tempered. revision to pa#202201276748. tot of 20 windows.Details
replace extg double hung wood sachs at front and sides with new wood sash, bathroom window glass to be tempered. revision to pa#202201276748. tot of 20 windows. | $49,000 |
| Apr 6, 2022 | Completed final sign-off Dec 2023 | 3875 Clay St | Citidev Inc. | revision to permit 202201276748. replace beam at garage.Details
revision to permit 202201276748. replace beam at garage. | $15,000 |
| Jan 28, 2022 | Completed final sign-off May 2024 | 471 14th Av | Citidev Inc. | infill with new structure at 1st floor level, below extg 2nd floor structure at rear, to be new habitable space. add nw rear yard access stair and balcony from 2nd floor to grade. add new or modify extg window/door openings on rear and side elevations at 1st and 2nd floors.Details
infill with new structure at 1st floor level, below extg 2nd floor structure at rear, to be new habitable space. add nw rear yard access stair and balcony from 2nd floor to grade. add new or modify extg window/door openings on rear and side elevations at 1st and 2nd floors. | $45,000 |
| Jan 27, 2022 | Completed final sign-off Dec 2023 | 3875 Clay St | Citidev Inc. | 1) at 1st flr, expand toilet rm and turn into bathrm. 2) at 2nd flr, turrn bath into laundry rm & toilet rm. 3) at 3rd flr, remodel 3 existing bathrooms, 4) relocate one furnace from garage to attic with (n) ducts.Details
1) at 1st flr, expand toilet rm and turn into bathrm. 2) at 2nd flr, turrn bath into laundry rm & toilet rm. 3) at 3rd flr, remodel 3 existing bathrooms, 4) relocate one furnace from garage to attic with (n) ducts. | $55,000 |
| Jan 26, 2022 | Never finaled issued Jan 2022, no final | 31 Carver St | Citidev Inc. | rev to pa201807205151: remove 2 (n) skylihgts from scope on g/f bathroom (106/107) & north section of roof (108 & 109), skylight 110 to remain (0pposite stair).Details
rev to pa201807205151: remove 2 (n) skylihgts from scope on g/f bathroom (106/107) & north section of roof (108 & 109), skylight 110 to remain (0pposite stair). | |
| Jan 18, 2022 | Completed final sign-off Apr 2024 | 2442 Great Hy | Citidev Inc. | interior remodel of 2 residential units (#1 & #3). front facade alterations.Details
interior remodel of 2 residential units (#1 & #3). front facade alterations. | $350,000 |
| Jun 24, 2021 | Expired or cancelled cancelled Jan 2026 | 1942 Divisadero St | Citidev Inc. | rev to app 201610281437 and 201610281440 rev. to show ada entrance on page a2.1 and a2.2 to show door not being recessed and swinging into the building.Details
rev to app 201610281437 and 201610281440 rev. to show ada entrance on page a2.1 and a2.2 to show door not being recessed and swinging into the building. | $8,500 |
| Jun 24, 2021 | Completed final sign-off Sep 2021 | 2442 Great Hy | Citidev Inc. | unit 2: remodel (e) bathroom in-kind, carpeting and paint. unit 4: remodel (e) bathroom in-kind, carpeting, paint.Details
unit 2: remodel (e) bathroom in-kind, carpeting and paint. unit 4: remodel (e) bathroom in-kind, carpeting, paint. | $80,000 |
| Jun 24, 2021 | Completed final sign-off Jul 2021 | 358 San Carlos St | Citidev Inc. | exterior rear stair / deck repair. less than 50% - in-kind. replace broken stringer, guardrail, strengthening, minor tread repair etc.Details
exterior rear stair / deck repair. less than 50% - in-kind. replace broken stringer, guardrail, strengthening, minor tread repair etc. | $7,000 |
| May 11, 2021 | Completed final sign-off Nov 2021 | 1066 14th St | Citidev Inc. | kitchen remodel in kind. new cabinets, countertop, wood flooring, add hood vent, trim,paint. reuse appliancesDetails
kitchen remodel in kind. new cabinets, countertop, wood flooring, add hood vent, trim,paint. reuse appliances | $30,000 |
| Mar 5, 2021 | Completed final sign-off Apr 2021 | 30 Presidio Av | Citidev Inc. | to obtain final inspection for work approved under permit application# 201906204050, 201908229567, and 201904158036. all work is completed.Details
to obtain final inspection for work approved under permit application# 201906204050, 201908229567, and 201904158036. all work is completed. | |
| Mar 3, 2021 | Completed final sign-off Feb 2022 | 31 Carver St | Citidev Inc. | revision to pa 201807205151. to address correction notice 202008182013 voluntary structural work. new steel beam, upgrade interior framing. replace dryrot.Details
revision to pa 201807205151. to address correction notice 202008182013 voluntary structural work. new steel beam, upgrade interior framing. replace dryrot. | $21,000 |
| Oct 30, 2020 | Never finaled issued May 2023, no final | 1728 Larkin St | Citidev Inc. | demolish a 1-story garage structure. new construction under pa# 202010217003.Details
demolish a 1-story garage structure. new construction under pa# 202010217003. | $10,000 |
| Oct 21, 2020 | Never finaled issued Apr 2023, no final | 1728 Larkin St | Citidev Inc. | construction of a new type-3b over type-1a, 6-unit, 6-story over basement residential structure on a lot currently containing a 1-story garage structure that is to be demolished. demo under pa# 202010307805.Details
construction of a new type-3b over type-1a, 6-unit, 6-story over basement residential structure on a lot currently containing a 1-story garage structure that is to be demolished. demo under pa# 202010307805. | $2,000,000 |
| Sep 3, 2020 | Completed final sign-off Feb 2021 | 310 San Jose Av | Citidev Inc. | 9 windows with wood double hung and 2 extrior doors at back deck, in-kind. (4 front windows, 4 back, 1 lightwell).Details
9 windows with wood double hung and 2 extrior doors at back deck, in-kind. (4 front windows, 4 back, 1 lightwell). | $25,000 |
| Aug 26, 2020 | Completed final sign-off Aug 2021 | 3620 19th St | Citidev Inc. | unit #23: remodel kitchen in kind with new appliances, cabinets, counters, replace trim and hardwood floors throughout, replace 2 bath toilets and vanities in kindDetails
unit #23: remodel kitchen in kind with new appliances, cabinets, counters, replace trim and hardwood floors throughout, replace 2 bath toilets and vanities in kind | $120,000 |
| Aug 26, 2020 | Completed final sign-off Feb 2021 | 2196 Hayes St | Citidev Inc. | kitchen remodel in kind with new cabinets, fixtures, appliances and counters, powder bath remodel in kind with new toilet and vanity, refinish floorsDetails
kitchen remodel in kind with new cabinets, fixtures, appliances and counters, powder bath remodel in kind with new toilet and vanity, refinish floors | $100,000 |
| Aug 18, 2020 | Completed final sign-off Feb 2022 | 31 Carver St | Citidev Inc. | replace water damage finishes in kind. flooring, kitchen cabinets, 2 bath fixtures, light fixtures, asll work on 1st fl and basmementDetails
replace water damage finishes in kind. flooring, kitchen cabinets, 2 bath fixtures, light fixtures, asll work on 1st fl and basmement | $165,000 |
| Aug 13, 2020 | Completed final sign-off Oct 2020 | 301 Arkansas St | Citidev Inc. | to address nov 202041050. to check all remaining carbels on the bldg are structurally fastined/attachedDetails
to address nov 202041050. to check all remaining carbels on the bldg are structurally fastined/attached | $500 |
| Jul 13, 2020 | Completed final sign-off Jan 2021 | 880 Castro St | Citidev Inc. | kitchen (10'x10') & bathroom (8'x10') remodel: replace kitchen cabinets and appliances in kind. replace bathroom fixtures (toilet, double vanity, shower valve & shower head) in kind . no structural work.Details
kitchen (10'x10') & bathroom (8'x10') remodel: replace kitchen cabinets and appliances in kind. replace bathroom fixtures (toilet, double vanity, shower valve & shower head) in kind . no structural work. | $120,000 |
| Jul 6, 2020 | Completed final sign-off Dec 2020 | 711 Marina Bl | Citidev Inc. | repair or replace dry rotted stringers at e rear stair. not more than 50%. replace e walkway slab at side rear new area drain at new slab new rwl connection. new cabinet rear porch, new closet 4th fl per planDetails
repair or replace dry rotted stringers at e rear stair. not more than 50%. replace e walkway slab at side rear new area drain at new slab new rwl connection. new cabinet rear porch, new closet 4th fl per plan | $85,000 |
| Feb 25, 2020 | Completed final sign-off Jan 2022 | 31 Carver St | Citidev Inc. | remove damaged drywall and flooring due to water damage. approx 1100sq ft drywall, 500sq ft of flooring. work to be carried out at 1st floor basement level. replace in kind 5/8" type x at walls less than 5' from property line.Details
remove damaged drywall and flooring due to water damage. approx 1100sq ft drywall, 500sq ft of flooring. work to be carried out at 1st floor basement level. replace in kind 5/8" type x at walls less than 5' from property line. | $5,000 |
| Dec 12, 2019 | Completed final sign-off Oct 2020 | 640 Sutter St | Citidev Inc. | tapestry room skim coat walls, paint walls, wallpaper certain walls. replace broken glass in (2) existing window.Details
tapestry room skim coat walls, paint walls, wallpaper certain walls. replace broken glass in (2) existing window. | $26,000 |
| Nov 1, 2019 | Completed final sign-off Nov 2019 | 329 San Jose Av | Citidev Inc. | to obtain final inspection for work approved under pa#201709127843 and 201705106208. all work is completeDetails
to obtain final inspection for work approved under pa#201709127843 and 201705106208. all work is complete | |
| Sep 24, 2019 | Completed final sign-off Oct 2019 | 711 Marina Bl | Citidev Inc. | revision to app#201805250183 to comply with nov#2019015231 enf-remove extg wood framed, illeagally construction sun rm, infill extg dr opening with wood framing, install new ply sheating and ptd. wd siding as indicated in drawing, install nw waterproof membrane at roof over 4th story roof to remain.Details
revision to app#201805250183 to comply with nov#2019015231 enf-remove extg wood framed, illeagally construction sun rm, infill extg dr opening with wood framing, install new ply sheating and ptd. wd siding as indicated in drawing, install nw waterproof membrane at roof over 4th story roof to remain. | $15,000 |
| Aug 22, 2019 | Never finaled issued Aug 2019, no final | 30 Presidio Av | Citidev Inc. | replace drywall at office area due to mold from water penetration. replace dry wall with lath and plaster in kitchen, family room. add laundry to storage room at basement level.Details
replace drywall at office area due to mold from water penetration. replace dry wall with lath and plaster in kitchen, family room. add laundry to storage room at basement level. | $3,500 |
| Jun 20, 2019 | Never finaled issued Jun 2019, no final | 30 Presidio Av | Citidev Inc. | reference to pa #201904158036: approx 30 sq ft dryrot repair at office (rear of bldg). replace (1) (e) alumn window & sliding doors (x3) in kind at rear of bldg.Details
reference to pa #201904158036: approx 30 sq ft dryrot repair at office (rear of bldg). replace (1) (e) alumn window & sliding doors (x3) in kind at rear of bldg. | $30,000 |
| May 22, 2019 | Never finaled issued May 2019, no final | 30 Presidio Av | Citidev Inc. | street spaceDetails
street space | |
| Apr 15, 2019 | Never finaled issued Apr 2019, no final | 30 Presidio Av | Citidev Inc. | change (e) kitchen cabinets and appliances in kind. 20x12 change 4.5 bathroom fixtures in kind. e. tile. bath 1 6x12, bath 2 10x10, bath 3 6x8, bath 4 8x8. 1/2 3x7Details
change (e) kitchen cabinets and appliances in kind. 20x12 change 4.5 bathroom fixtures in kind. e. tile. bath 1 6x12, bath 2 10x10, bath 3 6x8, bath 4 8x8. 1/2 3x7 | $205,000 |
| Apr 15, 2019 | Completed final sign-off Apr 2019 | 24 Abbey St | Citidev Inc. | to correct nov 201940531. to close communication opening between 22 & 24 abby st. revert back to previous legal condition.Details
to correct nov 201940531. to close communication opening between 22 & 24 abby st. revert back to previous legal condition. | $3,200 |
| Mar 7, 2019 | Completed final sign-off Jun 2019 | 1101 Powhattan Av | Citidev Inc. | repalce (e) cabinets in kind in kitchen, replace (e) appliances in kind in kitchen, replace (e) coutner tops in kitchen, approx 12x12Details
repalce (e) cabinets in kind in kitchen, replace (e) appliances in kind in kitchen, replace (e) coutner tops in kitchen, approx 12x12 | $40,000 |
| Jan 15, 2019 | Completed final sign-off Nov 2019 | 260 08th St | Citidev Inc. | new accessible restrooms, & new non-accessible restrooms. two new kitchenettes. remove partion walls at 1st fl & at mezzanine. new guardrail at mezz. new interior stairs to mezz. replace some post & beams at mezz framing. voluntary roof framing upgrade. new lighting & heating. maher naDetails
new accessible restrooms, & new non-accessible restrooms. two new kitchenettes. remove partion walls at 1st fl & at mezzanine. new guardrail at mezz. new interior stairs to mezz. replace some post & beams at mezz framing. voluntary roof framing upgrade. new lighting & heating. maher na | $90,000 |
| Sep 12, 2018 | Completed final sign-off Jan 2020 | 12 Oakwood St | Citidev Inc. | compliance with mandatory soft story retrofit program, cebc 2016 app.a4 & sfebc 2016 chp.40Details
compliance with mandatory soft story retrofit program, cebc 2016 app.a4 & sfebc 2016 chp.40 | $30,000 |
| Apr 27, 2018 | Completed final sign-off Jun 2018 | 139 Laidley St | Citidev Inc. | in kind repair at rear yard. change (2) 6x6 posts and add cross braces at (e) deck area. all work less than 50%Details
in kind repair at rear yard. change (2) 6x6 posts and add cross braces at (e) deck area. all work less than 50% | $4,000 |
| Mar 23, 2018 | Completed final sign-off Jan 2019 | 3236 Pacific Av | Citidev Inc. | repalce 21 windows with in-kind all dimensions and profiles to match existing. u-factor for all new windows shall not exceed 0.32. per tsd approval, u factor criteria not required. bldg is historical.Details
repalce 21 windows with in-kind all dimensions and profiles to match existing. u-factor for all new windows shall not exceed 0.32. per tsd approval, u factor criteria not required. bldg is historical. | $18,000 |
| Mar 2, 2018 | Completed final sign-off Jan 2019 | 3236 Pacific Av | Citidev Inc. | (8) new recessed lights & patch drywall @ sitting room adjacent to bathroom. bathroom remodel in kind, (n) shower, toilet, vanity & tiles. no change of any wall layout.Details
(8) new recessed lights & patch drywall @ sitting room adjacent to bathroom. bathroom remodel in kind, (n) shower, toilet, vanity & tiles. no change of any wall layout. | $40,000 |
| Jan 22, 2018 | Completed final sign-off Jan 2018 | 143 Laidley St | Citidev Inc. | replace 2 6"x12"x10" beams in kind due to early termite presence at front of garage area in crawl space belowDetails
replace 2 6"x12"x10" beams in kind due to early termite presence at front of garage area in crawl space below | $1,500 |
| Jan 22, 2018 | Completed final sign-off Jun 2018 | 1 South Park | Citidev Inc. | unit #301 -change 6' tall peninsula to counter hgt peninsula in the same location. replace (e) appliances in kind in kitchen maher naDetails
unit #301 -change 6' tall peninsula to counter hgt peninsula in the same location. replace (e) appliances in kind in kitchen maher na | $20,000 |
| Dec 4, 2017 | Completed final sign-off Jun 2018 | 329 San Jose Av | Citidev Inc. | revision to 201711022983, soft story retrofit per sfebc ch 4d, 2015 iebc app a4Details
revision to 201711022983, soft story retrofit per sfebc ch 4d, 2015 iebc app a4 | $30,000 |
| Nov 17, 2017 | Completed final sign-off May 2018 | 111 Caselli Av | Citidev Inc. | interior renovation at third floor; remove segment of partition and install casework at media room . new lighting at media roomDetails
interior renovation at third floor; remove segment of partition and install casework at media room . new lighting at media room | $6,000 |
| Nov 8, 2017 | Completed final sign-off May 2018 | 3930 Washington St | Citidev Inc. | cut underside of stair back at extg angled wall. n/a for maherDetails
cut underside of stair back at extg angled wall. n/a for maher | $5,000 |
| Nov 2, 2017 | Completed final sign-off Jun 2018 | 329 San Jose Av | Citidev Inc. | exterior stair at rear yard repaired in kind. no change to stair dimentsion. fence at rear yard replaced with new 6 ft tall wood fence. voluntary foundation upgrades. tme stair is arequired means of egress, no new fire rated walls.Details
exterior stair at rear yard repaired in kind. no change to stair dimentsion. fence at rear yard replaced with new 6 ft tall wood fence. voluntary foundation upgrades. tme stair is arequired means of egress, no new fire rated walls. | $26,000 |
| Oct 26, 2017 | Completed final sign-off Jan 2018 | 77 Jordan Av | Citidev Inc. | revision to pa#201609208174. voluntary partial foundation replacement at rear of building (under kitchen/family rm). maher naDetails
revision to pa#201609208174. voluntary partial foundation replacement at rear of building (under kitchen/family rm). maher na | $15,000 |
| Sep 19, 2017 | Completed final sign-off Jul 2018 | 105 Bradford St | Citidev Inc. | installation of 3/4 anchor bolts into (e) concrete foundation mud sill @ 32" on center with 9" minimum penetration drilled and epoxed.Details
installation of 3/4 anchor bolts into (e) concrete foundation mud sill @ 32" on center with 9" minimum penetration drilled and epoxed. | $6,000 |
| Sep 12, 2017 | Expired or cancelled expired Nov 2019 | 329 San Jose Av | Citidev Inc. | replace stucco in-kind front facade. revision to permit # 201705106208.Details
replace stucco in-kind front facade. revision to permit # 201705106208. | $8,000 |
| Aug 17, 2017 | Expired or cancelled cancelled Oct 2024 | 668 Guerrero St | Citidev Inc. | demolition of a 1-story warehouse.Details
demolition of a 1-story warehouse. | $25,000 |
| Jul 5, 2017 | Completed final sign-off Oct 2018 | 2785 Jackson St | Citidev Inc. | unit 4 - remodel (e) kitchen, baths, new powder room, no work outside of unit. n/a ordinance #155-13Details
unit 4 - remodel (e) kitchen, baths, new powder room, no work outside of unit. n/a ordinance #155-13 | $40,000 |
| May 10, 2017 | Expired or cancelled expired Nov 2019 | 329 San Jose Av | Citidev Inc. | replace 20 windows in kind on the street facade. new windows shall be wood frame aluminum clad. u-factor 0.32 max.Details
replace 20 windows in kind on the street facade. new windows shall be wood frame aluminum clad. u-factor 0.32 max. | $10,000 |
| May 9, 2017 | Completed final sign-off Feb 2018 | 2927 Broderick St | Citidev Inc. | at top floor, install one fixed 45 minute fire rated property line window. the window is not visible from the street per ab-009.Details
at top floor, install one fixed 45 minute fire rated property line window. the window is not visible from the street per ab-009. | $2,500 |