Alan Toll
- Listed as
- architect
- On San Francisco permits
- Jul 2021 to Jul 2025
7 permits since 2000 (architect on 7 permits): 6 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 21, 2025 | Completed final sign-off Jul 2026 | 2555 Leavenworth St | Bayview Iron Works Inc | new fire escape platform at rooftop matching existing type. new inclined ladder to roof to replace existing ladder. reverse direction of existing inclined ladders. new cantilevered stairs to grade to replace existing ladder.Details
new fire escape platform at rooftop matching existing type. new inclined ladder to roof to replace existing ladder. reverse direction of existing inclined ladders. new cantilevered stairs to grade to replace existing ladder. | $75,000 |
| Jun 12, 2025 | Completed final sign-off Nov 2025 | 704 Great Hy | Bayview Iron Works Inc | remove and repair galvanize existing fire escape. in-kindDetails
remove and repair galvanize existing fire escape. in-kind | $10,000 |
| Dec 3, 2024 | Completed final sign-off Nov 2025 | 2555 Webster St | Bayview Iron Works Inc | at (e) clip connections replace (e) wood blocking lag screws w/steel angel clips. install (n) through bolts, 1 per clip and the back to (e) stud or floor framing. plans make reference to the removal and replacement of an access window which will be performed under separate permit application.Details
at (e) clip connections replace (e) wood blocking lag screws w/steel angel clips. install (n) through bolts, 1 per clip and the back to (e) stud or floor framing. plans make reference to the removal and replacement of an access window which will be performed under separate permit application. | $100,000 |
| Sep 11, 2024 | Completed final sign-off Nov 2025 | 62 Dolores Tr | Perez Construction Llc. | replace (e) guardrail at 2nd & 3rd fl. replace (e) maintenance stair from 4th fl at rear to roof.Details
replace (e) guardrail at 2nd & 3rd fl. replace (e) maintenance stair from 4th fl at rear to roof. | $50,000 |
| Oct 2, 2023 | Completed final sign-off Jun 2024 | 1130 Pine St | Bayview Iron Works Inc | to comply w/nov 202314176 fire escape removal & reinstallDetails
to comply w/nov 202314176 fire escape removal & reinstall | $75,000 |
| Jul 23, 2021 | Completed final sign-off Nov 2022 | 3833 17th St | replace (e) wood fire escape w/ new metal system; like-for-like route; material to be non-combustible; ladder to be straight vs. existing accordion ladderDetails
replace (e) wood fire escape w/ new metal system; like-for-like route; material to be non-combustible; ladder to be straight vs. existing accordion ladder | $10,000 | |
| Jul 23, 2021 | Expired or cancelled cancelled Jan 2026 | 1022 Stanyan St | add a fire escape ladder system from 3rd flr at the rear of bldg.Details
add a fire escape ladder system from 3rd flr at the rear of bldg. | $20,000 |