Adam J. Bittle
- Listed as
- architect, designer, engineer
- Firm
- Architecture Allure, Inc.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2012 to May 2026
24 permits since 2000 (architect on 21 permits, designer on 2 permits, engineer on 1 permit): 14 completed, 1 in progress, 5 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 13, 2026 | In progress filed May 2026, not yet issued | 2636 Green St | D G M L Construction Inc | revision to pa# 202603187814, remove roof deck scope @ 4/f, replace fire escape inkind, replace all mechanical equipment. bathroom scope changes @ 3/f: remodel (e) primary bath, remodel (e) bath between bedrooms, remove (e) bath @ top of stairs. new bath @ library, remodel half-bath @ 4/f inkind.Details
revision to pa# 202603187814, remove roof deck scope @ 4/f, replace fire escape inkind, replace all mechanical equipment. bathroom scope changes @ 3/f: remodel (e) primary bath, remodel (e) bath between bedrooms, remove (e) bath @ top of stairs. new bath @ library, remodel half-bath @ 4/f inkind. | |
| Nov 25, 2020 | Never finaled issued Aug 2021, no final | 2636 Green St | D G M L Construction Inc, Bailey General Contracting Co Inc | remodel of (e) 4 story home. exterior: replace (e) windows and doors in kind. repair (e) siding and exterior finishes. remodel (e) roof deck at 4/f. interior: in-kind kitchen remodel. in-kind remodel of half bath at 2/f. in -kind remodel of 4 bathrooms. removal of half bath at 4th fl.Details
remodel of (e) 4 story home. exterior: replace (e) windows and doors in kind. repair (e) siding and exterior finishes. remodel (e) roof deck at 4/f. interior: in-kind kitchen remodel. in-kind remodel of half bath at 2/f. in -kind remodel of 4 bathrooms. removal of half bath at 4th fl. | $50,000 |
| May 8, 2019 | Expired or cancelled cancelled Jan 2026 | 51 Somerset St | new deck & stair at rear. new exterior doors at 2nd flr rear. interior remodel at 1st floorDetails
new deck & stair at rear. new exterior doors at 2nd flr rear. interior remodel at 1st floor | $10,000 | |
| May 3, 2018 | Completed final sign-off Oct 2019 | 527 Peralta Av | new door at rear 2nd fl, new deck at rear 2nd fl, kitchen remodel, infill at (e) lightwell.Details
new door at rear 2nd fl, new deck at rear 2nd fl, kitchen remodel, infill at (e) lightwell. | $50,000 | |
| Jan 16, 2018 | Expired or cancelled cancelled Nov 2024 | 120 Church St | rear addition at commercial space on ground floor. rear & front addition at 2nd & 3rd flrs. sprinkler 13 throughoutDetails
rear addition at commercial space on ground floor. rear & front addition at 2nd & 3rd flrs. sprinkler 13 throughout | $595,000 | |
| Nov 7, 2017 | Completed final sign-off Nov 2018 | 640 02nd Av | J Brown Construction | remodel e 3 story residence. replace e windows/doors throughout, 1st flr conditioned space attached to 2nd fl: bedroom, fam rm, full bath, laundry, mudroom. replace unpermitted exterior rear stair. infill lighterll at rear.Details
remodel e 3 story residence. replace e windows/doors throughout, 1st flr conditioned space attached to 2nd fl: bedroom, fam rm, full bath, laundry, mudroom. replace unpermitted exterior rear stair. infill lighterll at rear. | $150,000 |
| Jul 17, 2017 | Completed final sign-off Jul 2018 | 37 Sanchez St | B W H Builder Inc. | revision 201608044176, addition of 3 alum clad wood windows along north exterior wall, no new sf added. new siding to match e as much as possibleDetails
revision 201608044176, addition of 3 alum clad wood windows along north exterior wall, no new sf added. new siding to match e as much as possible | $10,000 |
| Jul 7, 2017 | Completed final sign-off Oct 2017 | 218 Richland Av | O'neill & Neville Construction Inc | new skylights for e home. no new square footageDetails
new skylights for e home. no new square footage | $500 |
| Apr 5, 2017 | Completed final sign-off Oct 2017 | 361 Hermann St | Hammerhouse Construction | interior kitchen remodel of existing unit in two unit bldg, 208 sf total area of remodle. no new s.f.Details
interior kitchen remodel of existing unit in two unit bldg, 208 sf total area of remodle. no new s.f. | $12,000 |
| Mar 6, 2017 | Completed final sign-off Jul 2018 | 37 Sanchez St | B W H Builder Inc. | revision to 201608044176: reduction in scope. no structural work interior remodel, replace (e) side windows, new window added to side - not visible, revised kitchen remodel, revised bath no floor area addedDetails
revision to 201608044176: reduction in scope. no structural work interior remodel, replace (e) side windows, new window added to side - not visible, revised kitchen remodel, revised bath no floor area added | |
| Oct 13, 2016 | Expired or cancelled withdrawn Oct 2023 | 848 Rhode Island St | infill 25 sqft of (e)38sqft lightwell against blank neighboring wall for (n) bath at (e) home.(3)new windows, area of work is 33 sqft total.Details
infill 25 sqft of (e)38sqft lightwell against blank neighboring wall for (n) bath at (e) home.(3)new windows, area of work is 33 sqft total. | $50,000 | |
| Sep 19, 2016 | Expired or cancelled cancelled Nov 2022 | 89 Roosevelt Wy | vertical & horizontal addition. remodel of (e) multi-unit building to incl addition of a mezzanine & roof decks with planters for top unit. sprinklers will be instaled. (n) half bath.Details
vertical & horizontal addition. remodel of (e) multi-unit building to incl addition of a mezzanine & roof decks with planters for top unit. sprinklers will be instaled. (n) half bath. | $200,000 | |
| Sep 12, 2016 | Never finaled issued Sep 2016, no final | 236 Ashbury St | Dugarry Construction Inc | remodel of extg residence: no addition and no work on front exterior. unconditioned garage/storage to be made into conditioned living space connected to main residence with kitchen and bath remodel. alteration of (e) windows and (n) windows on side and rear elevations.Details
remodel of extg residence: no addition and no work on front exterior. unconditioned garage/storage to be made into conditioned living space connected to main residence with kitchen and bath remodel. alteration of (e) windows and (n) windows on side and rear elevations. | $150,000 |
| Aug 4, 2016 | Completed final sign-off Jul 2018 | 37 Sanchez St | B W H Builder Inc. | interior & exterior remodel - exterior wrok to side & back only to match (e) conditions as much as possible. interior work to kitchen, bath, bedroom. living room no sf added, windows to be alum clad wood & all new siding to match (e).Details
interior & exterior remodel - exterior wrok to side & back only to match (e) conditions as much as possible. interior work to kitchen, bath, bedroom. living room no sf added, windows to be alum clad wood & all new siding to match (e). | $100,000 |
| Dec 29, 2015 | Completed final sign-off Mar 2016 | 1215 20th Av | Merchant Construction | remove extg non-load bearing interior partition walls in extg home on 2/f only, as shown on a.0.0 only.Details
remove extg non-load bearing interior partition walls in extg home on 2/f only, as shown on a.0.0 only. | $5,000 |
| Oct 29, 2015 | Never finaled issued Nov 2015, no final | 120 Church St | Sing Wong | remodel of existing b occupancy, removal of garage doors and replacing entry door, new store front. restore curb. use will be retail. window to be wood or aluminum.Details
remodel of existing b occupancy, removal of garage doors and replacing entry door, new store front. restore curb. use will be retail. window to be wood or aluminum. | $100,000 |
| May 6, 2015 | Completed final sign-off Sep 2015 | 373 Warren Dr | Merchant Construction | interior remodel of master bedroom suite. replacement of surround to (e) fireplace. no sq ft addedDetails
interior remodel of master bedroom suite. replacement of surround to (e) fireplace. no sq ft added | $35,000 |
| Dec 30, 2014 | Completed final sign-off Oct 2015 | 217 Flood Av | Peninsula Construction Concepts Inc | interior remodel to (e) 1066 sf single family residence. no change to existing footprint. alterations in master suite and kitchen.Details
interior remodel to (e) 1066 sf single family residence. no change to existing footprint. alterations in master suite and kitchen. | $75,000 |
| Nov 21, 2014 | Never finaled issued Nov 2014, no final | 1319 Page St | Merchant Construction | remove extg front room fireplace and surround repair notched framing at floor. patch walls and ceilings and floors to match extg at both upper and lower units. not visable from streetDetails
remove extg front room fireplace and surround repair notched framing at floor. patch walls and ceilings and floors to match extg at both upper and lower units. not visable from street | $4,000 |
| Sep 3, 2014 | Completed final sign-off Oct 2015 | 1539 41st Av | Hammerhouse Construction | interior alterations to second level of (e) 1,545 sq.ft. no changes to existing footprint, total square footage to remain 1,545 sq.ft.Details
interior alterations to second level of (e) 1,545 sq.ft. no changes to existing footprint, total square footage to remain 1,545 sq.ft. | $50,000 |
| Jun 25, 2014 | Never finaled issued Dec 2015, no final | 35 Beachmont Dr | Broadway Mech.Cntrs.,Inc. | 180 sq. ft. addition & 640 sq. ft. interior remodel to 9e) 2464 sq. ft. single family residence. no changes to (e) foot print.Details
180 sq. ft. addition & 640 sq. ft. interior remodel to 9e) 2464 sq. ft. single family residence. no changes to (e) foot print. | $150,000 |
| Apr 18, 2014 | Completed final sign-off Sep 2014 | 1169 Filbert St | Box Canyon Builders Dba The Englander | remodel extg 27 sq ft bathroom with exterior wall alteration. additions of 14 sq ft into extg lightwell. compliance with maher ordinance no. 155-13 not required.Details
remodel extg 27 sq ft bathroom with exterior wall alteration. additions of 14 sq ft into extg lightwell. compliance with maher ordinance no. 155-13 not required. | $15,000 |
| Apr 16, 2014 | Completed final sign-off Oct 2014 | 1005 Noe St | Merchant Construction | unit #3 - remove three existing windows at south elevation of 3rd floor unit & replace with one window, not visible from street. replace 8 windows in same lightwell in kind (unit 1 & 2).Details
unit #3 - remove three existing windows at south elevation of 3rd floor unit & replace with one window, not visible from street. replace 8 windows in same lightwell in kind (unit 1 & 2). | $10,000 |
| Mar 22, 2012 | Completed final sign-off Jul 2012 | 3027 Buchanan St | Merchant Construction | interior bath remodel of (e) full bath and (e) half bath on street level.Details
interior bath remodel of (e) full bath and (e) half bath on street level. | $18,000 |